Planning application DSDZ5107/22
Planning permission for development at this site (0.1244 ha) Building R, Spencer Dock, Mayor Street Upper, Dublin 1.
Building R, Spencer Dock, Mayor Street Upper, Dublin 1
Decision
GRANT PERMISSION
Construction status
Construction commenced
Official building-control evidence dated 19 Apr 2023.
Matched phased building-control records
Source: NBCO/BCMS open data
An official council link is not available for this recorded application.
Application details
- Planning reference
- DSDZ5107/22
- Council
- Dublin City Council
- Proposal description
- Planning permission for development at this site (0.1244 ha) Building R, Spencer Dock, Mayor Street Upper, Dublin 1. The development will consist of the change of use of part of the building from office use to education use (GFA: 7,446sq.m) described on a level by level basis as follows: Ground Floor: Reception and associated facilities including toilets, welfare room, first aid room, showers / lockers, First Floor: 2no. classrooms, breakout space, ancillary offices, interview rooms, meeting room, training room, print area, tea station and ancillary accommodation, Second Floor: 2no. classrooms, breakout space, ancillary offices, meeting rooms, print area, tea station and ancillary accommodation, Third Floor: 2no. classrooms, breakout space, ancillary offices, meeting rooms, print area, tea station, and ancillary accommodation, Fourth Floor: Library, ancillary offices, meeting rooms and study spaces, Fifth Floor: Library, ancillary offices, study spaces, tea station, print room and ancillary accommodation, Sixth Floor: Canteen with associated kitchen area, and meeting rooms. The building will be served by existing access, stair and lift cores and circulation space. The ground floor retail unit occupied by Tesco will remain unchanged by this permission. Car parking (18no. spaces) and cycle parking (188no. spaces) to serve the development are located within the existing basement car park. No external alterations to the building are proposed under this planning application. Planning permission is also sought for all ancillary site services and site development works. The application relates to a proposed development within the North Lotts and Grand Canal Dock SDZ Planning Scheme Area.
- Location / address
- Building R, Spencer Dock, Mayor Street Upper, Dublin 1
- Application type
- Permission
- Received / registered
- 24 Oct 2022
- Council decision
- GRANT PERMISSION
- Council decision date
- 13 Dec 2022
- Final grant date
- 13 Dec 2022
Planning and construction timeline
Key dated milestones from planning, appeal and official building-control records.
Application received
Decision: GRANT PERMISSION
Final grant
Works commenced
Official NBCO/BCMS dataCompletion certificate validated (1 unit)
Official NBCO/BCMS data
Location context
Nearby sold prices
Recent Property Price Register sales in Spencer Dock. Distances are not shown because the sale records do not contain reliable coordinates.
€535,000
32 HILL OF DOWN, SPENCER DOCK, DUBLIN 1
Sold 31 Aug 2026
Locality match
€415,000
30 CLONCURRY HOUSE, SPENCER DOCK, DUBLIN 1
Sold 28 Aug 2026
Locality match
€460,000
96 KIRKPATRICK HOUSE, SPENCER DOCK, DUBLIN 1
Sold 21 Aug 2026
Locality match
€462,555
15 SAUNDERS HOUSE, SPENCER DOCK, DUBLIN 1
Sold 6 Aug 2026
Locality match
€437,000
2 KILLASHEE HOUSE, SPENCER DOCK, DUBLIN 1
Sold 6 Aug 2026
Locality match
€499,500
2 VALENTIA HOUSE, SPENCER DOCK, IFSC DUBLIN 1
Sold 30 Jul 2026
Locality match

