Planning application 3274/24
We, NWQ Devco Limited, intend to apply for a 10-year planning permission for development at a site consisting of the…
CitiGroup Building, 1 North Wall Quay, Dublin 1, D01T8Y1
Appeal decision
Refuse Permission
Latest milestone
Appeal decision: Refuse Permission
11 Aug 2025
An official council link is not available for this recorded application.
Application timeline
Key milestones
Council and An Coimisiún Pleanála milestones.
Application received
Decision: REFUSE PERMISSION
Appeal lodged with An Coimisiún Pleanála
Official An Coimisiún Pleanála dataView appeal caseAppeal decision: Refuse Permission
Official An Coimisiún Pleanála dataView appeal case
Application details
- Planning reference
- 3274/24
- Council
- Dublin City Council
- Proposal description
- We, NWQ Devco Limited, intend to apply for a 10-year planning permission for development at a site consisting of the CitiGroup Building, 1 North Wall Quay, Dublin 1, DO1 T8Y1. The site is bound by North Wall Quay to the south, Commons Street to the west, Clarion Quay/Alderman Way to the north and an access ramp to the existing basement to the east. The site area is c. 0.88 ha. The proposed development comprises: •Demolition of existing 6 no. storey office building and single-level basement; •Construction of a mixed-use development ranging in height from 9 no. to 17 no. storeys in height (73.4m) over lower ground floor and double basement comprising office accommodation, arts/community/cultural spaces and retail/cafe/restaurant uses; •The development is divided into 4 no. buildings ranging in heights of 12 no. storeys (Block A), 17 no. storeys (Block B), 10 no. storeys (Block C) and 9 no. storeys (Block D); • The overall gross floor area of the development comprises 87,209 sq.m. (excluding double basement of 14,420 sq.m.) including 69,258 sq.m. of office space, 2,371 sq.m. arts/community/cultural uses and 196 sq.m. of retail/café/restaurant space; • Office accommodation is proposed at lower-ground floor to 15th floor with 4 no. double-height office entrance/receptions areas provided at GF level; • 3 no. internal arts/community/cultural spaces are provided in total. 1 no. arts/community/cultural space is provided over lower ground and ground floor level in Block A, 1 no. at 1st floor level with a GF entrance space in Block B and an arts/community/cultural use with viewing deck is provided at 16th floor level in Block B; • External arts/community/cultural space will be provided on the new landscaped park located to the east of the site; •1 no. retail/café/restaurant unit is provided at GF level in Block D; • Outdoor landscaped terraces are provided at 8th, 9th, 10th, 11th, 15th and 16th floor level; • Provision of winter terraces at 4th, 6th and 9th floor level; • Provision of a shared atrium between Block B and Block C; • Green roofs and blue roofs are provided across the scheme; • Provision of a double basement comprising 30 no. car parking spaces, 923 no. bicycle parking spaces, 6 no. motorbike parking spaces and male & female shower and changing facilities at B1 level and plant across B1 & B2 levels; • 2 no. car parking spaces located at street level (32 no. total); •Provision of 2 no. vehicle lifts and 2 no. bike lifts to the basement accessed from Clarion Quay; •The development includes the fill and cover of existing access ramp to existing basement to provide a landscaped park (including external arts/community/cultural space) to the east of the building connecting North Wall Quay with Clarion Quay. The park will include a pedestrian link from North Wall Quay to Clarion Quay •Provision of upgrades to existing public realm within application site including public footpaths along North Wall Quay, Commons Street and Clarion Quay; •All ancillary and associated works to facilitate the development including plant, switch rooms, generators, water tanks, sprinkler plant, ESB substations, landscaping, telecommunications infrastructure, utilities connections and infrastructure. An Environmental Impact Assessment Report and Natura Impact Statement have been prepared in respect of the proposed development and have been submitted with the planning application.
- Location / address
- CitiGroup Building, 1 North Wall Quay, Dublin 1, D01T8Y1
- Application type
- Permission
- Received / registered
- 23 Feb 2024
- Council decision
- REFUSE PERMISSION
- Council decision date
- 16 Apr 2024
- Appeal lodged
- 13 May 2024
- Appeal decision
- Refuse Permission
- Appeal decision date
- 11 Aug 2025
Location context
Nearby sold prices
Recent Property Price Register sales in Dublin 1. Distances are not shown because the sale records do not contain reliable coordinates.
€431,000
4 CANON LILLIS AVE, DUBLIN 1, DUBLIN
Sold 23 Jul 2026
Locality match
€500,000
515 NORTH CIRCULAR RD, DUBLIN 1, DUBLIN
Sold 14 Jul 2026
Locality match
€1,050,000
466 NORTH CIRCULAR RD, DUBLIN 1, DUBLIN
Sold 2 Jul 2026
Locality match
€390,000
28 HENRIETTA HALL 43 BOLTON ST, DUBLIN 1, DUBLIN
Sold 19 Jun 2026
Locality match
€485,000
15 LANGRISHE PLACE, DUBLIN 1, DUBLIN
Sold 29 May 2026
Locality match
€425,000
59 HAPENNY BRIDGE HOUSE, DUBLIN 1, DUBLIN
Sold 25 May 2026
Locality match