Planning application 2974/20

PROTECTED STRUCTURE: The proposed development will consist of the refurbishment/reconfiguration…

The Central Hotel, Nos 1-5 Exchequer Street and Nos 11, 14, 15 & 16 South Great George’s Street and No. 12 Dame Court, Dublin 2

Appeal decision

Grant permission with revised conditions

Latest milestone

Final grant

27 May 2021

An official council link is not available for this recorded application.

Application timeline

Key milestones

Council and An Coimisiún Pleanála milestones.

  1. Application received

  2. Further information requested

  3. Further information received

  4. Decision: GRANT PERMISSION

  5. Appeal lodged with An Coimisiún Pleanála

    Official An Coimisiún Pleanála dataView appeal case
  6. Final grant

  7. Appeal decision: Grant permission with revised conditions

    Official An Coimisiún Pleanála dataView appeal case

Application details

Planning reference
2974/20
Council
Dublin City Council
Proposal description
PROTECTED STRUCTURE: The proposed development will consist of the refurbishment/reconfiguration, partial sundry demolition and expansion of the Central Hotel (a protected structure RPS. Ref. No. 2719) to result in an overall amalgamated hotel of 6,554 sqm with a total of 125 bedrooms within 5 storeys over basement with a 6 storey element with plant level (above No.12 Dame Court) and will include the following: 1) Demolition of existing 2 storey building No.12 Dame Court (c. 245 sq.m) and its replacement with a 6 storey building (overall height c.22.205m) including a basement area amalgamated with the hotel with lift and stairs, access for deliveries and refuse storage, and electricity sub-station at ground floor level and hotel bedrooms from mezzanine through fourth floor levels with plant level above building. The external elevational treatment to street is a profiled glazed façade with perforated/profiled metal panels to match the adjacent rooftop extension. 2) Refurbishment and reconfiguration of existing Central Hotel and associated premises as follows:- A) Basement level - Removal of internal partitions/walls to facilitate reconfiguration/refurbishment of basement areas of Central Hotel and Nos 11, 14, 15 & 16 South Great George's Street to provide ancillary hotel areas including the internal alterations to the Rí-Rá nightclub as a speakeasy and the creation of its entrance lobby, toilets, storage/plant/attenuation & staff areas. Change of use of basement areas of Nos 14, 15 & 16 South Great George's Street from ancillary retail storage to form part of an amalgamated hotel use as plant, administration space, public and staff toilet areas and part kitchen; B) Ground floor level - Amalgamation of Nos 14, 15 & 16 South Great George's Street into the Central Hotel and associated change of use from retail to cafe/delicatessen and bar/restaurant. Reconfiguration/refurbishment of internal areas of reception, lounge and associated backroom areas and a covered winter garden link to The Exchequer Lounge. The change of use of the following; ground floor of No.11 South Great George's Street from public bar to retail use (as Christian Science Reading Room moved from its current location at No.15 South Great George's Street); ground floor of No.14 South Great George's Street from retail use to bar/restaurant use; ground floor of No.15 South Great George's Street from retail use to bar/restaurant use; ground floor of No.16 South Great George's Street from retail use to café/delicatessen use; ground floor area at entrance to existing Exchequer Bar to change to become part of hotel reception; ground floor area as part of the existing Globe Bar/Rí-Rá nightclub from public bar use to retail use as part of the amalgamated hotel; C) First floor level - Refurbishment and provision of bedrooms (to include removal and insertion of partitions/WC facilities, insertion of risers); refurbishment of existing 'library bar' (and associated alterations); change of use of part of Library bar as 2 no. bedrooms; removal of infill block connected by stair to existing retail unit at No.14 South Great George's Street; removal of existing keg room and addition of a garden terrace; removal of ancillary space in courtyard to provide a landscaped platform area (including void to existing basement passageway), maintenance access only; D) Second and Third floor levels - Refurbishment and provision of bedrooms (to include removal and insertion of partitions, insertion of risers and removal of exit passageway (external) between existing east and west parts of hotel), introduction of an inaccessible landscaped terrace at second floor level; E) Fourth floor level - Removal of existing fourth floor level Mansard roof structure of the Central Hotel fronting onto Dame Court and Exchequer Street and its replacement with a new fourth floor level in its place to comprise a screen of narrow vertical metal fins, in front of a wall of glazing and metal panels with a standing seam metal roof in the same colour and material and 2 no. dormers facing onto Exchequer Street (new plant areas within pitched roof space); removal of eastern side of pitched slate roof along South Great George's Street and provision of bedrooms/storage (with flat roof above), the removal of a chimney on Dame Court close to Exchequer Street and the heightening of the remaining chimneys to the ridge height of the new roof to Dame Court; replacement of the 2 no. pediments on the South Great George's Street elevation in terracotta and brickwork; provision of external balcony/terrace areas. F) Removal of existing lift shafts and stair cores (including chimney) from basement/ground to 4th floor levels and provision of new stairwells/lift shafts/servicing ducts/risers/dumb waiters as well as revisions to circulation/access (including provision of new opes) and removal of internal walls/partitions/replacement of doors as necessary; new glazed opening in existing staircase; glazed finish to internal facade of new northern 'wing' (which includes bedrooms and access 1st to 4th floor levels); G) External works to include; new canopies/signage, refurbished and replacement shopfronts (and lighting) on Exchequer Street & South Great George's Street facades (including replacement of existing non-original entrance canopy), replacement of windows at ground floor level; repointing and replacement of existing windows with matching timber sliding sash windows as required; the new façade to the courtyard comprises a glazed screen with vertical metal fins incorporating some metal panels and solar shading devices in the same metal finish; installation of secondary glazing units to bedrooms; revised entrance treatment and signage throughout above shopfronts to South Great George's Street and Exchequer Street including the new centralised entrance and the replacement glazed screens to Dame Court; the introduction of 5 no. basement lights on Dame Court; and all associated site development works.
Location / address
The Central Hotel, Nos 1-5 Exchequer Street and Nos 11, 14, 15 & 16 South Great George’s Street and No. 12 Dame Court, Dublin 2
Application type
Permission
Received / registered
6 Jul 2020
Council decision
GRANT PERMISSION
Council decision date
18 Nov 2020
Final grant date
27 May 2021
Appeal lodged
11 Dec 2020
Appeal decision
Grant permission with revised conditions
Appeal decision date
27 May 2021