Large residential
2 shownOctober Two Ltd. intends to apply for planning permission for development on lands of c. 0.505ha at 794, 796 and 798 Howth Road, Dublin 5, D05KP65, D05HK76, D05Rt99. The development will consist of the demolition of the 3 no. existing two-storey houses (of c. 233.7 sqm. c. 234.4sqm and c. 172.5 sqm respectably) and associated outbuildings, and the construction of a new residential development in 2 no. new build blocks, Block A and Block B, ranging between 3 and 5 storeys in height over single basement level. The development consists of 58 no. residential units (20 no. 1 bed units, 29 no. 2 bed units, and 9 no. 3 bed units), associated residential amenity space, ancillary plant, refuse and bicycle parking storage. The overall development proposal provides for the following: Block A (c. 3312.1sqm GFA) - 5 storeys and shall consist of 40 no. units (15 no. 1 bed units, 16 no. 2 bed units, and 9 no. 3 bed units) with associated balconies, and access cores. Block B (c. 1481.7 sqm GFA)- 3 storeys and shall consist of 18 no. apartment units (5 no. 1 bed units, and 13 no. 2-bed units) with associated balconies and access cores. Each residential unit has an associated area of private open space in the form of balconies. The development shall also provide for the provision of vehicular and pedestrian access off Howth Road; 35 no. car parking spaces at basement level - (including 2 no. designated accessible spaces and 18no. EV charging spaces), 2 no. motorcycle parking spaces, 135 no. bicycle parking spaces (105 no. resident spaces, 30 no. visitor spaces), refuse and recycling storage facilities, ESB substation and switch room, bicycle store, and plant and storage rooms. The site development and infrastructural works provide for water, foul and surface water drainage and all associated connections; all ESB connections/infrastructure and site service connections; all landscaping and public lighting; all boundary treatment works; internal walkways and hard landscaping; and all associated site clearance, demolition, and development works necessary to facilitate the development of the site. A Natura Impact Statement has been prepared in respect of the planning application.
ActiveRegistered Application794-798 Howth Road, Raheny, Dublin 5 · 5 Feb 2026
Planning permission for amendments to a previously permitted residential development (Reg. Ref. 3930/18; ABP-303146-18). The proposed revisions shall consist of: (a) an increase of 15 no. apartments (comprising 7 no. 1 bedroom units; 7 no. 2 bedroom units; 1 no. 3 bedroom unit) to provide 86 no. apartments (71 previously permitted) within 2 no. blocks and increase in the heights of previously permitted Blocks 02 and 03 from 4 storeys to 5 storeys; (b) the proposed development shall now comprise the following: Block 02 - 5 storey block (4 storeys plus setback penthouse level) (4 storeys previously permitted) comprising of 38 no. residential units (18 no. 1 bedroom units and 20 no. 2 bedroom units) with balconies/terraces on east and west elevations. Block 03 - 5 storey block (4 storeys plus setback penthouse level) (4 storeys previously permitted) comprising 37 residential units (18 no. 1 bedroom units, 18 no. 2 bedroom units and 1 no. 3 bedroom unit) with balconies/terraces on northwest and southeast elevations; (c) associated internal and elevational changes to Blocks 02 and 03; (d) increase in basement level area with increase in car parking spaces from 75 no. spaces to 97 no. spaces and increase in basement level bicycle parking spaces from 70 no. spaces to 111 no. spaces; (e) reposition the vehicular and pedestrian access gate to St. Brigid's Road; (f) increase in open space area in lieu of 4 no. houses omitted by condition no. 2(b) attached ABP Ref. 303146-18; (g) Provision of Fire Tender Access to the south of Block 01 and 02; and (h) All associated engineering and site development works necessary to facilitate the development.
ActiveAppeal DecidedFormer Holy Faith Convent Building, St. Brigid's Road, Killester, Dublin 5 · 21 Aug 2019

