OpenList

Planning application 26/2426

Milebush Quarry Backfilling and C&D Waste Facility

Milebush Quarry, Ballynabointra and Burgesland, Midleton, Co. Cork, P25 NV27

Current status

Under assessment

Next key date

Decision due

11 November 2026

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

  2. Decision due

    Target date

    Current decision target recorded by the council.

OpenList context

Why this application matters

Quarry restoration

The proposal would backfill a 4.9-hectare exhausted quarry void at Milebush Quarry, within an overall 11.2-hectare application area, to approximately 27 metres above Ordnance Datum.

Materials processing

A 1.9-hectare construction and demolition waste processing area is proposed alongside short-term material storage. Backfill material would comprise either inert soil and stone, including river dredge spoil, or notified soil-and-stone by-product.

Site and road works

The scheme would use the quarry’s existing weighbridge, wheelwash, garage, parking and welfare facilities, with a new 140-square-metre inspection shed, drainage and landscaping works, and improvements at the L7648/N25 junction about 120 metres north of the entrance.

Environmental assessment

An Environmental Impact Assessment Report and Natura Impact Statement accompany the proposed quarry restoration and waste-management activity.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
26/2426
Council
Cork County Council
Proposal description
Permission for the backfilling of an exhausted quarry void (quarry registration ref: QR078) and acceptance, short-term storage and processing of construction and demolition (C&D) waste on-site, within an overall application area of circa (ca). 11.2 hectare (ha.). The development will consist of the backfilling of the quarry void (ca. 4.9ha) to a level of ca. 27 metres above Ordnance Datum (mAOD) with either: 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stones, and river dredge spoil which will result in the proposed development operating as a soil recovery facility that requires a waste management licence from the Environmental Protection Agency (EPA); or 2) Soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product at its source of origin and transported as a by-product material to enable the site to be backfilled. The proposed C&D processing facility will cover an area of ca. 1.9ha and will operate under a waste management licence from the EPA. The development will also comprise of the construction of an inspection shed (ca.140m2) and ancillary improvements to drainage and landscaping. The development will utilise existing infrastructure on-site including weighbridge, wheelwash, garage, car parking and welfare facilities. The development will also include junction improvement works at the L7648 / N25 junction, located ca. 120m north of the quarry entrance. The application relates to development which involves an activity requiring a waste licence from the EPA. A planning permission of 20 years is being sought for the proposed development. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
Location / address
Milebush Quarry, Ballynabointra and Burgesland, Midleton, Co. Cork, P25 NV27
Application type
Permission
Received / registered
17 Sept 2026

Location context

Nearby sold prices

Recent Property Price Register sales in Midleton. Distances are not shown because the sale records do not contain reliable coordinates.

Explore sold prices