OpenList

Planning application 26/2190

Aghada LDES Battery Energy Storage Project

The townland of Ballincarroonig, Aghada, Co. Cork, within the wider ESB landholding

Current status

Application registered

Next key date

Decision due

15 October 2026

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

  2. Decision due

    Target date

    Current decision target recorded by the council.

OpenList context

Why this application matters

Scale and equipment

The project would create a battery energy storage system of up to 300 MW across 4.65 hectares. It includes up to 200 battery enclosures, up to 20 medium-voltage inverter skids, a control building and switchgear equipment.

Grid connection infrastructure

A dedicated customer high-voltage compound would contain grid step-up transformers, five auxiliary transformers, circuit breakers and related electrical equipment. New internal access roads, hardstanding, drainage, lighting, CCTV and a connection from the existing Aghada station are also proposed.

Generating station setting

The site lies within the wider ESB Aghada Generating Station complex at Ballincarroonig. The station operates under an Industrial Emissions Licence and is a lower-tier COMAH establishment, while the proposed battery storage development is not itself a COMAH establishment or an activity requiring an Industrial Emissions Licence.

Related Aghada energy project

A separate 1 MW hydrogen production demonstration facility within Aghada Generating Station previously received conditional permission. That project includes electrolysis, hydrogen storage, on-site fuel-cell use and off-site transport of hydrogen.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
26/2190
Council
Cork County Council
Proposal description
Electricity Supply Board (ESB) intend to apply for Permission for development at this site of 4.65 hectares at Ballincarroonig, Aghada, County Cork, within the wider ESB landholding. The development will consist of the "Aghada LDES" (Aghada Long Duration Energy Storage) project comprising a Battery Energy Storage System (BESS) with a capacity of up to 300 MW. It comprises a fenced compound containing a BESS compound and Customer HV Compound. Specifically, the BESS compound will feature up to 200 No. 20 ft battery energy storage system (BESS) enclosures and up to 20 No. Medium Voltage (MV) Skids / Twin Inverter Skids and associated bunds. Associated ancillary equipment includes 1 no. MV switchgear building, 1 no. Control Building, 5 no. LV Switchgear Containers, a fire water tank and pumphouse, Operation and Maintenance site offices (O&M portacabin) including welfare facilities, 3 no. spare parts stores (20-40 ft containers), 1 no. backup diesel generator plinth, an underground fire water retention tank, a surface water soakaway, harmonics structure (if required following testing of equipment), all services connections including electrical, potable water and connections to surface water drains, external lighting poles, CCTV, lighting monopole. The proposed Customer HV Compound will comprise Grid Step-up Transformers and associated bunds and fire walls, 5 No. Auxiliary Transformers and associated bunds, associated electrical equipment including current transformers/voltage transformers (CT/VT) Circuit Breakers, Neutral Earth Resistors, Cable Chairs, and Line Earth Disconnects, external lighting poles, CCTV, lightning monopole. The development proposal also includes a new site access road from the existing Aghada station, access gate, palisade fencing to secure both compounds (2.6m high) and all ancillary site clearance and development works including provision of areas of hard standing, internal access roads, laydown area, car parking and connections to site services and networks. The proposed development is located within the wider ESB Aghada Generating Station complex, which operates under EPA Industrial Emissions Licence Ref. P0561-05 and is a notified Lower Tier COMAH / Seveso establishment. A COMAH Land Use Planning Assessment has been submitted with the application. The proposed BESS development itself is not a COMAH establishment and does not comprise an activity requiring an Industrial Emissions Licence.
Location / address
The townland of Ballincarroonig, Aghada, Co. Cork, within the wider ESB landholding
Applicant
Electricity Supply Board (ESB)
Agent
Maria Rochford
Application type
Permission
Received / registered
21 Aug 2026
Ward / district
Municipal Districts: Municipal District of East Cork
Grid reference
584316, 564591

Application location

Approximate map position from available planning location data.

Location context

Nearby sold prices

Recent Property Price Register sales in Aghada. Distances are not shown because the sale records do not contain reliable coordinates.

Explore sold prices