OpenList

Planning application 26/1782

Electricity Supply Board (ESB) intend to apply for planning permission for the development of the "Aghada LDES" (Aghada…

The townland of Ballincarroonig, Aghada, County Cork, within the wider ESB landholding

Current status

Invalid or incomplete

Latest milestone

Application received

2 Jul 2026

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

Application details

Planning reference
26/1782
Council
Cork County Council
Proposal description
Electricity Supply Board (ESB) intend to apply for planning permission for the development of the "Aghada LDES" (Aghada Long Duration Energy Storage) project comprising a Battery Energy Storage System (BESS) with a capacity of up to 300 MW on 4.65 Ha of lands located in the townland of Ballincarroonig, Aghada, County Cork, within the wider ESB landholding. The proposed development will consist of a fenced compound containing a BESS compound and Customer HV Compound. Specifically, the BESS compound will feature up to 200 No. 20 ft battery energy storage system (BESS) enclosures and up to 20 No. Medium Voltage (MV) Skids / Twin Inverter Skids and associated bunds. Associated ancillary equipment includes 1 no. MV switchgear building consisting of 2 no. adjoining prefabricated buildings, 1 no. Control Building, 5 no. LV Switchgear Containers, a fire water tank and pumphouse, Operation and Maintenance site offices (O&M portacabin) including welfare facilities, 3 no. spare parts stores (20-40 ft containers), 1 no. backup diesel generator plinth, an underground fire water retention tank, a surface water soakaway, harmonics structure (if required following testing of equipment), all services connections including electrical, potable water and connections to surface water drains, external lighting poles, CCTV, lighting monopole. The proposed Customer HV Compound will comprise Grid Step-up Transformers and associated bunds and fire walls, 5 No. Auxiliary Transformers and associated bunds, associated electrical equipment including current transformers/voltage transformers (CT/VT) Circuit Breakers, Neutral Earth Resistors, Cable Chairs, and Line Earth Disconnects, external lighting poles, CCTV, lightning monopole. The development proposal also includes a new site access road from the existing Aghada station, access gate, palisade fencing to secure both compounds (2.6m high) and all ancillary site clearance and development works including provision of areas of hard standing, internal access roads, laydown area, car parking and connections to site services and networks.
Location / address
The townland of Ballincarroonig, Aghada, County Cork, within the wider ESB landholding
Applicant
Electricity Supply Board (ESB)
Agent
Maria Rochford
Application type
Permission
Received / registered
2 Jul 2026
Ward / district
Municipal Districts: Municipal District of East Cork
Grid reference
584316, 564591

Application location

Approximate map position from available planning location data.

Location context

Nearby sold prices

Recent Property Price Register sales in Aghada. Distances are not shown because the sale records do not contain reliable coordinates.

Explore sold prices