Planning application 26/1781

Full planning permission for new developments at lands at Quartertown Lower, Mallow, Co.

Quartertown Lower, Mallow, Co. Cork

Current status

Further information requested

Latest milestone

Application received

2 Jul 2026

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

OpenList context

Why this application matters

Industrial scheme scale

The proposal is for seven light-industrial/warehouse units in two blocks, with a combined gross floor area of 2,058.54 sq m. Supporting works include an ESB substation, parking including EV, accessible and visitor spaces, cycle shelters, bin storage, signage, lighting, landscaping and drainage.

Estate access and servicing

The units would be served from the existing gated entrance and shared access road for the adjoining IDA Business and Technology Park, with alterations and an extension to the internal access road plus new footpaths. A separate 2026 application (26/2305) proposes relocating a vehicular entrance within Quartertown Industrial Estate onto the industrial-estate road.

Protected-structure setting

The application site lies within the curtilage of Quartertown Mills, a protected structure listed as RPS No. 00284. Boundary treatments, landscaping and other site works therefore form part of development proposed in this protected-structure setting.

Nearby warehouse adaptation

At the former Homa Pumps Building in Quartertown Industrial Estate, permission 25/4291 covers conversion of 242 sq m of existing warehouse space to ancillary offices, with external insulation, additional glazing and altered windows and doors. This indicates continuing industrial and warehouse-related occupation in the surrounding estate.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
26/1781
Council
Cork County Council
Proposal description
Full planning permission for new developments at lands at Quartertown Lower, Mallow, Co. Cork. The proposed site is within the curtilage of Protected Structure RPS No. 00284 ( Quartertown Mills, Quartertown Lower). The development will consist of: 1) to construct 7 no. light industrial / warehouse units (Units 1 to 2 at Block A, Units 3 to 7 at Block B) with a gross total floor area of 2058.54sq.m, to be accessed via existing gated site entrance from shared access road serving the adjoining IDA Business and Technology Park 2) proposed alterations to and extension of existing internal access road and provision of new internal footpaths to serve new development 3) the development will also include construction of; 1no. ESB substation to serve development, car parking spaces including EV, accessible parking bays and visitor parking and bicycle parking shelters; covered bin storage areas; new boundary treatments; new signage on site; hard and soft landscaping, public lighting and all associated site development works above and below ground.
Location / address
Quartertown Lower, Mallow, Co. Cork
Applicant
Kilknockan Partnership
Agent
Sinead Moore
Application type
Permission
Received / registered
2 Jul 2026
Ward / district
Municipal Districts: Municipal District of Kanturk - Mallow
Grid reference
554438, 597641

Application location

Approximate map position from available planning location data.

Location context

Nearby sold prices

Recent Property Price Register sales in Mallow. Distances are not shown because the sale records do not contain reliable coordinates.

Explore sold prices