OpenList

Planning application 26/1755

The proposed development (to be known as Madigan's Solar Farm) within the red line boundary for which permission is…

Castleharrison, Ardnageehy, Ballynadrideen, Charleville, Co. Cork.

Current status

Application registered

Next key date

Decision due

7 October 2026

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

  2. Decision due

    Target date

    Current decision target recorded by the council.

OpenList context

Why this application matters

Solar farm scale

Madigan’s Solar Farm is proposed across a 55.55-hectare red-line boundary in the townlands of Ballynadrideen, Ardnageehy and Castleharrison, Charleville. It comprises ground-mounted PV arrays, inverters/transformers, underground cabling, construction compounds, fencing, CCTV, landscaping and biodiversity works, with 1,470m of new internal tracks alongside about 2,250m of existing farm tracks.

Two parcels and phasing

The scheme occupies western and eastern land parcels on opposite sides of the proposed M20 motorway. Phase 1 covers the western parcel, the inter-parcel cable beneath the M20, the link to Ardnageehy Solar Farm and motorway-side tree belts; Phase 2 covers the eastern parcel. The parcels would also be linked beneath the existing L5529 road.

Grid and related development

The western parcel would connect by underground cable to the previously consented Ardnageehy Solar Farm (Cork County Council 236099 / ABP-320298-24). The wider connection is stated to reach the consented Ballyroe 110kV Substation (ABP 314431-22) via an underground grid connection determined exempt development (Cork County Council D/201/25 / ACP 322653-25). An earlier Cork County Council submission, 26/0049, described a 55.55-hectare two-parcel solar farm on the same townlands with the same M20 crossing and grid connection approach.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
26/1755
Council
Cork County Council
Proposal description
The proposed development (to be known as Madigan's Solar Farm) within the red line boundary for which permission is sought consists of: •the construction of, 40-year operation of, and subsequent decommissioning of a 55.55-hectare (137.26 acres) solar farm centred at approximately E:553,500 and N:618,400, and comprised of two parcels of land located to the west and east of the proposed M20 Motorway respectively; •the connection of the two parcels of land by means of an underground grid connection (UGC) to be constructed underneath the proposed M20 Motorway and the existing L5529 public road; •a further UGC from the proposed western parcel of the solar farm to the previously consented Ardnageehy Solar Farm (Cork Co. Co. Pl. Ref: 236099 / ABP-320298-24); and •10m-wide tree belts along both sides of the proposed M20 Motorway. The development will then be connected to the national grid at the consented Ballyroe 110kV Substation (permitted by An Coimisuin Pleanala ref. 314431-22) by way of an underground grid connection, previously determined by An Coimisiún Pleanála to be exempted development (Cork Co. Co. Pl. Ref. D/201/25 /; ACP ref. 322653-25). The proposed development is to be built in two separate phases within the 10-year planning permission period. Phase 1 will comprise of the western land parcel and all that is proposed within it, together with the underground grid connection from it to the consented Ardnageehy Solar Farm, as well as the proposed underground grid connection, linking the eastern and western land parcels underneath the proposed M20 Motorway, and the 10m wide tree belt proposed along both sides of the proposed motorway. Phase 2 will comprise of the eastern land parcel and all that is proposed within it, apart from the tree belt within it and underground grid connection linking it to the western land parcel. The proposed development will comprise of a series of ground-mounted solar photovoltaic (PV) panels mounted on pile driven ground support pole structures. The proposed development also includes electrical inverters/transformers, underground cabling and temporary construction compounds. Access to the western and eastern land parcels will utilise existing entrances onto the public roads. The proposed solar farm includes the use of approximately 2,250m existing internal farm access tracks that are not proposed to be upgraded as well as 1,470m proposed new internal access tracks. The proposed development also includes new internal gates, CCTV poles and cameras, deer-type security/boundary fencing, landscaping and biodiversity measures which includes the removal of approximately 45m of existing hedgerow and the planting of approximately 1,536m of new hedgerow, and all ancillary development works required to generate renewable energy electricity and transmit it in the townlands of Ballynadrideen, Ardnageehy and Castleharrison, Charleville, Co. Cork. In accordance with Article 239 of the Planning and Development Regulations 2001 (as amended), notice is hereby given: a) that a Natura Impact Statement will be submitted to the planning authority with the application, and b) that the Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the planning authority. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The planning application may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority, County Hall, Carrigrohane Road, Co. Cork, during its public opening hours, i.e. 9.00a.m. to 4.00 p.m. Monday to Friday (excluding public holidays). A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee, €20, within the period of- (a) 5 weeks, or (b) 2 weeks, in the case of a planning application for small-scale solar energy equipment development or development that is the installation of a small-scale non-ground source heat pump, beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions or may refuse to grant permission.
Location / address
Castleharrison, Ardnageehy, Ballynadrideen, Charleville, Co. Cork.
Applicant
Soleire Renewables Holdings Limited
Agent
Entrust Limited
Application type
Permission
Received / registered
30 Jun 2026
Ward / district
Municipal Districts: Municipal District of Kanturk - Mallow
Grid reference
553639, 618727

Application location

Approximate map position from available planning location data.

Location context

Nearby sold prices

Recent Property Price Register sales in Charleville. Distances are not shown because the sale records do not contain reliable coordinates.

Explore sold prices