Planning application 25/6877
Littlesilver Battery Storage Facility
Littlesilver, Bandon, Co. Cork
Current status
Further information requested
Latest milestone
Application received
19 Dec 2025
Application timeline
Key milestones
Key dated milestones from the planning record.
Application received
OpenList context
Why this application matters
Energy storage scheme
A battery energy storage facility is proposed on a c. 1.29-hectare site at Littlesilver, Bandon, with 28 rechargeable battery containers and associated medium-voltage equipment.
Grid connection
The facility would connect to the Bandon 110kV substation via an underground cable, alongside diversion of an existing overhead line on the site.
Site renewal
The proposal includes demolition and removal of a decommissioned wind turbine and associated outbuilding, replacing them with a 38kV substation building and electrical compounds.
Access and drainage
Works include upgrades to the existing entrance and access tracks, parking, security and boundary fencing, landscaping, and drainage measures including a retention basin, soakaways and rainwater harvesting.
OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.
Application details
- Planning reference
- 25/6877
- Council
- Cork County Council
- Proposal description
- EDF Renewables Ireland Limited intend to apply for a 10 Year Permission for development at this site of c. 1.29 ha, located on lands at Littlesilver, Bandon, Co. Cork. The proposed development consists of a battery energy storage system (BESS) facility, which will comprise of rechargeable battery units contained within 28 no. c. 25 ft containers on site; 7 no. MVs units; 1 no. auxiliary transformer; a resistor, reactor and harmonic filter unit; a low voltage (LV) building and a welfare and spares container. The proposed development also involves the diversion of the existing overhead line on site and includes an underground cable, which will connect the BESS facility to the Bandon 110kV substation. The proposed development will include for the demolition and removal of the existing decommissioned wind turbine and associated outbuilding on site. The proposed development also includes the construction of a 38kV substation building with associated compounds and car parking; stock proof fencing and gateways; landscaping; foul water holding tank; rainwater harvesting tank; stone soakaways; piped infrastructure and ducting; retention basin and stone headwall; signage; security fencing; boundary treatments; lighting; CCTV; SUDs; permeable gravel area; upgrading of the existing site entrance with partial hedgerow removal; new access track and upgrading of the existing access track; and all associated site development and excavation works above and below ground. Planning permission is sought for a period of 10 years.
- Location / address
- Littlesilver, Bandon, Co. Cork
- Applicant
- EDF Renewables Ireland Limited
- Agent
- ÓRla Casey (Tom Phillips + Associates)
- Application type
- Permission
- Received / registered
- 19 Dec 2025
- Ward / district
- Municipal Districts: Municipal District of Bandon - Kinsale
- Grid reference
- 549741, 558533
Application location
Approximate map position from available planning location data.
Location context
Nearby sold prices
Recent Property Price Register sales in Bandon. Distances are not shown because the sale records do not contain reliable coordinates.
€425,000
KNOCKAVEALE, BANDON, COUNTY CORK
Sold 27 Oct 2026
Locality match
€382,000
10 CLANCOOL TERRACE, BANDON, CO.CORK
Sold 20 Oct 2026
Locality match
€350,000
20 MEADOWLANDS, BANDON, CORK
Sold 6 Oct 2026
Locality match
€280,000
1 BRIDGE STREET, BANDON, CO. CORK
Sold 6 Oct 2026
Locality match
€411,233
14 Blossom Hill, Bandon, Cork
Sold 5 Oct 2026
Locality match
€220,000
BALLYLNAGLEY, BANDON, CO CORK
Sold 24 Sept 2026
Locality match