Solar energy
2 shownDerryroe Battery Energy Storage and Solar Facility
Permission for a Battery Energy Storage System (BESS) facility and Solar Farm. The development will consist of the following elements: i. A Battery Energy Storage System (BESS) facility with a storage capacity of 130-150 MW, consisting of battery containers with HVAC units, transformers, inverters, underground cabling, 2 No. associated control rooms, internal access routes, parking, lighting, CCTV, lightning masts, fencing. ii. A solar PV array with an export capacity of 3 MW, comprising of ground-mounted panels on metal frames, together with associated inverters, transformer station, lighting, CCTV, fencing and internal electrical and communications cabling. iii. Operations and Electrical Compound consisting of: a. Low voltage operations compound including three (3) operations containers (switchgear room, control & metering room and communications room), outdoor electrical plant, above ground and underground cabling, lighting, CCTV, diesel generator and diesel tank, welfare and office container, storage containers and waste storage areas, and adjoining; b. High voltage electrical compound (TSO and IPP compound) comprising outdoor electrical plant, transformers, cabling, lighting, CCTV, lightning masts, fencing. iv. Underground high voltage electrical cable to facilitate a connection to the existing 110/220kV Clashavoon substation. v. New entrances and access roads (1 No. main access and 1 No. emergency access) to the site from the L7473 local road including 1 no. stream crossing and associated sightline improvement works, including the setback, lowering and trimming of existing boundaries and vegetation as required; and vi. all associated drainage and ancillary works necessary to facilitate the development. A 10 year permission and a 40 year operational period is sought in respect of this planning application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
ActiveUnder assessmentIn the townlands of Derryroe, Macroom and Kilberrihert, Coachford, Co. Cork, Co. Cork · 16 Oct 2026
7.5 MWp Solar PV Array, Danone Factory, Macroom
Danone Infant Nutrition Macroom Limited, intends to apply to the above-named Planning Authority for planning permission for a development at lands located immediately to the east of the existing Danone Factory, Inchinashingane, Macroom, Co. Cork, P12 XW40. Planning permission was previously granted by Cork County Council on 21 June 2024 under Planning Register Reference 23/05350 for a ground mounted solar photovoltaic development on the site. The current application seeks permission for a revised solar photovoltaic development, due to changes in the size and layout of the proposed installation. The proposed development will consist of the installation of a ground mounted solar photovoltaic array with an approximate capacity of 7.50 MWp (approximately 6.00 MW), comprising approximately 11,816 photovoltaic panels within a site area of approximately 11.43 hectares. The photovoltaic panels will be mounted on steel support tables fixed into the ground, arranged in rows, set at an inclined angle of 15 degrees. The mounting structures will have a typical maximum height of approximately 3.8 metres and a minimum height of approximately 0.8 metres above ground level. The development will include associated inverters, transformers, underground direct current and alternating current cabling, internal access tracks, perimeter security fencing with wildlife access points, CCTV where required, drainage works, and all associated site development works. The development will also include a temporary construction compound and welfare facilities during the construction phase. Danone Infant Nutrition Macroom Limited currently operates under an Integrated Pollution, Prevention and Control Licence (IPCC Licence) and an Industrial Emissions Directive Licence (IED) This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413), and it is important to note that the planning application may be subject to Section 34D of the Planning and Development Act 2000, as amended. Where a notice issues in accordance with Section 34D(b), the provisions of Article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Granted with conditionsDanone Factory, Inchinashingane, Macroom,, Co. Cork, P12 XW40 · 21 May 2026