Infrastructure
2 shown24m Telecommunications Monopole at Carrigtwohill GAA
Permission for erection of a 24m monopole structure on concrete base to support 9 no. telecommunications antennae together with the installation of dishes and associated fencing, cabling, compound area, ground-based equipment cabinets, mini pillar and all associated site works
Granted with conditionsCarrigtwohill GAA, West End, Carrigtwohill, Co.Cork · 15 Sept 2025
Barryscourt Solar Park Grid Connection
Permission for a 20kV underground grid connection cable in the townlands of Barryscourt, Rossmore and Ballintubbrid West, near Carrigtwohill, Co. Cork. The proposed development is intended to connect the permitted Barryscourt Solar Park (Pl. Ref. 17/4596) to the existing Carrigtwohill 38KV Substation. The Proposed development will consist of: The laying of 20kV underground electrical grid connection (c.2.45km in length), utilising both private lands and public roads, with c.1.157km in the public road (L3619), from the existing Carrigtwohill 38kV substation to the permitted Barryscourt Solar Park (Pl. ref. 17/4596). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 20kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application.
Granted with conditionsBarryscourt Rossmore Ballintubbrid West Near Carrigtwohill, Co. Cork · 7 Feb 2025