Large residential
2 shownPermission for a Large-Scale Residential Development (LRD) representing Phase 2 of development in the Blarney East/Ringwood Expansion Area, and comprising the construction of (I) 323 no. residential dwellings comprising of 157 no. terraced, end-of-terrace, and semi-detached houses (including 129 no. 3-bed and 28 no. 4-bed units): 52 no. duplexes provided in 5 no. 3-storey buildings (including 26 no. 2-bed and 26 no. 3-bed units) and 114 no. apartments provided in 2 no. 5-storey buildings (including 54 no. 1-bed and 60 no. 2-bed units); (ii) a primary care centre, over 2 stories and 1,724sqm in area, incorporating GP services (iii) the refurbishment and redevelopment of existing farm outbuildings for conversion to a retail/pharmacy use, 80sqm in area, and cafe/restaurant use, 380sqm in area; (iv) a new access roadway into the site from the R617 with associated pedestrian and cyclist infrastructure, which will form the 1st phase of the proposed Stoneview Access Link Road, (v) a new signalised junction on the R617 road which will provide a single lane approach to the west and a two lane approach to the east, comprising one lane for through traffic on the R617 and a right turn lane for traffic turning into the site, and associated footpath improvements and cycle lane provision (vi) a new signalised junction at the R617 and Killard Road junction which will provide a two lane approach from the west, one lane for through traffic heading eastbound on the R617 an a right turn lane onto the Killard Road, with associated footpath improvements and pedestrian and cyclist infrastructure; (vii) a new signalised junction on Station Road that reflects the junction permitted under the Phase 1 LRD scheme (Reg. Ref. 2443031); (viii) private, communal, and public open spaces and hard and soft landscaping, boundary treatments and amenity areas, including a new wetland public amenity area, (ix) drainage works and nature-based SuDS measures (x) foul sewer infrastructure, including 1no. pump station, the diversion of existing foul and water sewers and other new network works, (xi) car parking, including EV charging points, bicycle parking, and motorcycle parking bays (xii) 2 no. substations, and all associated ancillary site, drainage and development works. An Environmental Impact Assessment Report (EIAR) has been submitted to the planning authority with the application.
ActiveFURTHER INFORMATIONRingwood, Shean Upper and Shean Lower, Blarney, Cork · 16 Dec 2025
Permission for a Large-Scale Residential Development (LRD) at this site at Ringwood, Shean Upper, Blarney, Cork. The proposed development will consist of a largescale residential development (LRD), representing Phase 1 of the development in the Blarney East / Ringwood Expansion Area, and comprising of 246no. residential dwellings as follows: 101no. apartments arranged in 4no. part 3-storey, part 4-storey apartment blocks (to include 6no. 1-bed studio units, 35no. 1-bed units and 60no. 2-bed units); 30no. duplex dwellings arranged in 3no. 3-storey buildings (to include 15no. 1-bed dwellings and 15no. 2-bed dwellings); and 115no. 2-storey and 3-storey houses (to include 19no. 2-bed dwellings, 64no. 3-bed dwellings, and 32no. 4-bed dwellings). The proposed development also includes crèche (380.6sqm) with capacity to accommodate 61no. children. The proposed development will include provision for car parking, including EV charging points, bicycle parking, and motorcycle parking bays, and the provision of an area reserved for future resident car parking to the rear of Woodville Terrace on Station Road. The proposed development will also include the provision of private, communal, and public open spaces; internal roads and pathways with potential for future links to adjacent lands; pedestrian and cyclist routes; hard and soft landscaping and boundary treatments; waste storage; plant; signage; a new signalised access onto Station Road and road and footpath improvement works on Station Road and the R617 road; public lighting; 2no. new substations; all associated site development works; and all drainage and foul sewer infrastructure and network works, including nature-based SuDS measures. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR). The application may be inspected online at the following website: www.ringwoodphase1lrd.ie
CONDITIONALRingwood , Shean Upper , Blarney · 27 Jun 2024

