Planning application 2660530
Long Duration Energy Storage Facility, Moneypoint
Within the existing Moneypoint Generating Station landholding, In the townland of Carrowdotia South, and the ESB owned lands within the Maritime Area
Application timeline
Key milestones
Key dated milestones from the planning record.
Application received
Further information requested
Decision due
Target dateCurrent decision target recorded by the council.
OpenList context
Why this application matters
Energy-storage scheme
The proposal is for a long-duration energy-storage facility on the former coal storage area within the existing Moneypoint Generating Station landholding, extending to ESB-owned maritime lands.
Storage and grid equipment
The facility would include up to 564 storage enclosures arranged in 47 linear bays across 12 blocks, with 47 medium-voltage inverter skids, transformers, switchgear and underground electrical cabling.
High-voltage connection
A 3,068 sq m air-insulated switchgear compound is proposed, including a step-up transformer, electrical control building and associated protection equipment.
Operational infrastructure
Ancillary works include a 194m noise barrier, fire-water tank and pumphouse, below-ground fire-water retention tank, backup-generator plinths, maintenance accommodation and modifications to the existing settlement pond.
OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.
Application details
- Planning reference
- 2660530
- Council
- Clare County Council
- Proposal description
- For a ten-year permission for development on lands comprising the former coal storage area, within the existing Moneypoint Generating Station landholding in the townland of Carrowdotia South, and ESB owned lands within the maritime area, County Clare. The proposed development will comprise the construction/installation of a Long Duration Energy Storage (LDES) facility and associated plant and equipment, within a fenced compound, comprising the following main components: • LDES Area- Up to 564 No (c. 6.8m L x 2.4m W x 3.1m H) LDES enclosures split across 47 No linear bays, within 12 No blocks. Each linear bay contains 2 rows of 6 LDES enclosures. Each bay will be on a concrete plinth measuring c. 57.1m L x 6.5m W x 0.3m H;- 47 No Medium Voltage (MV) Battery Energy Storage System (BESS) Inverter Skids/ Twin Inverter Skids (c. 12.8m L x 6m W x 2.4m H) and associated plinths (c. 13.3m L x 6.5m W x 0.3m H), bunds and fire walls;- 10 No Auxiliary Transformers (c. 2.6m L x 2m W x 3m H including foundation / plinth), associated bunds (c. 4m L x 4m W x 0.8m H) and fire walls;- 2 No MV Switchgear Pre-fabricated Buildings (c. 18.85m L x 6m W x 4.6m H);- 5 No Low Voltage Switchgear Containers (c. 8m L x 5m W x 3.61m H);- Noise barrier (c.194m L x 6m H); • Ancillary Equipment- 1 No Power Quality Equipment (c. 5m L x 5m W x 3m H); - 1 No Fire Water Storage Tank (c. 13.4m diameter x 9.8m H) on c. 14.5m diameter x 0.35m H plinth; - 1 No Fire Water Pumphouse (c. 10m L x 6.2m W x 5.4m H);- 4 No 40” Spares Containers (c. 12.2m L x 2.4m W x 2.59m H);- 4 No Back Up Diesel Generator Plinths (c. 7m W x 4.1m L x 0.15m H); - 1 No operational & maintenance Portakabin (c. 9.15m L x 3.05m W x 3.15m H);- 1 No Double Toilet Block (c. 2.4m L x 1.2m W x 2.5m H) with Foul Holding Tank;- 1 No Below ground Fire Water Retention Tank;- Modifications to the existing Settlement Pond; • High Voltage Air Insulated Switchgear (AIS) Compound (c. 3068 sqm footprint), bounded by up to 4m H palisade fencing, containing - 1 No Step-Up Transformer (c. 18m L x 8m W x 11m H) and associated bund (c. 23.2m L x 19.7m W) and fire walls (c. 11m H); - Associated electrical equipment including, Current transformers / voltage transformers (CT/VT) Circuit Breakers, Neutral Earth Resistors, Cable Chairs, and Line Earth Disconnects; • 1 No Prefabricated Electrical Control (PEC) /Modular Control and Protection Building (c. 18.85m L x 4.2m W x 4.6m H); • The Proposed LDES development will connect via underground cab
- Location / address
- Within the existing Moneypoint Generating Station landholding, In the townland of Carrowdotia South, and the ESB owned lands within the Maritime Area
- Application type
- PERMISSION
- Received / registered
- 17 Aug 2026
- Valid date
- 17 Aug 2026
Location context
Nearby sold prices
OpenList shows sold-price context only where a reliable proximity, Eircode or locality relationship can be established.