Long Duration Energy Storage Facility, Moneypoint

Within the existing Moneypoint Generating Station landholding, In the townland of Carrowdotia South, and the ESB owned lands within the Maritime Area

Current status

Further information requested

Next key date

Decision due

11 October 2026

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

  2. Further information requested

  3. Decision due

    Target date

    Current decision target recorded by the council.

OpenList context

Why this application matters

Energy-storage scheme

The proposal is for a long-duration energy-storage facility on the former coal storage area within the existing Moneypoint Generating Station landholding, extending to ESB-owned maritime lands.

Storage and grid equipment

The facility would include up to 564 storage enclosures arranged in 47 linear bays across 12 blocks, with 47 medium-voltage inverter skids, transformers, switchgear and underground electrical cabling.

High-voltage connection

A 3,068 sq m air-insulated switchgear compound is proposed, including a step-up transformer, electrical control building and associated protection equipment.

Operational infrastructure

Ancillary works include a 194m noise barrier, fire-water tank and pumphouse, below-ground fire-water retention tank, backup-generator plinths, maintenance accommodation and modifications to the existing settlement pond.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
2660530
Council
Clare County Council
Proposal description
For a ten-year permission for development on lands comprising the former coal storage area, within the existing Moneypoint Generating Station landholding in the townland of Carrowdotia South, and ESB owned lands within the maritime area, County Clare. The proposed development will comprise the construction/installation of a Long Duration Energy Storage (LDES) facility and associated plant and equipment, within a fenced compound, comprising the following main components: • LDES Area- Up to 564 No (c. 6.8m L x 2.4m W x 3.1m H) LDES enclosures split across 47 No linear bays, within 12 No blocks. Each linear bay contains 2 rows of 6 LDES enclosures. Each bay will be on a concrete plinth measuring c. 57.1m L x 6.5m W x 0.3m H;- 47 No Medium Voltage (MV) Battery Energy Storage System (BESS) Inverter Skids/ Twin Inverter Skids (c. 12.8m L x 6m W x 2.4m H) and associated plinths (c. 13.3m L x 6.5m W x 0.3m H), bunds and fire walls;- 10 No Auxiliary Transformers (c. 2.6m L x 2m W x 3m H including foundation / plinth), associated bunds (c. 4m L x 4m W x 0.8m H) and fire walls;- 2 No MV Switchgear Pre-fabricated Buildings (c. 18.85m L x 6m W x 4.6m H);- 5 No Low Voltage Switchgear Containers (c. 8m L x 5m W x 3.61m H);- Noise barrier (c.194m L x 6m H); • Ancillary Equipment- 1 No Power Quality Equipment (c. 5m L x 5m W x 3m H); - 1 No Fire Water Storage Tank (c. 13.4m diameter x 9.8m H) on c. 14.5m diameter x 0.35m H plinth; - 1 No Fire Water Pumphouse (c. 10m L x 6.2m W x 5.4m H);- 4 No 40” Spares Containers (c. 12.2m L x 2.4m W x 2.59m H);- 4 No Back Up Diesel Generator Plinths (c. 7m W x 4.1m L x 0.15m H); - 1 No operational & maintenance Portakabin (c. 9.15m L x 3.05m W x 3.15m H);- 1 No Double Toilet Block (c. 2.4m L x 1.2m W x 2.5m H) with Foul Holding Tank;- 1 No Below ground Fire Water Retention Tank;- Modifications to the existing Settlement Pond; • High Voltage Air Insulated Switchgear (AIS) Compound (c. 3068 sqm footprint), bounded by up to 4m H palisade fencing, containing - 1 No Step-Up Transformer (c. 18m L x 8m W x 11m H) and associated bund (c. 23.2m L x 19.7m W) and fire walls (c. 11m H); - Associated electrical equipment including, Current transformers / voltage transformers (CT/VT) Circuit Breakers, Neutral Earth Resistors, Cable Chairs, and Line Earth Disconnects; • 1 No Prefabricated Electrical Control (PEC) /Modular Control and Protection Building (c. 18.85m L x 4.2m W x 4.6m H); • The Proposed LDES development will connect via underground cab
Location / address
Within the existing Moneypoint Generating Station landholding, In the townland of Carrowdotia South, and the ESB owned lands within the Maritime Area
Application type
PERMISSION
Received / registered
17 Aug 2026
Valid date
17 Aug 2026

Location context

Nearby sold prices

OpenList shows sold-price context only where a reliable proximity, Eircode or locality relationship can be established.

Explore sold prices
No reliable nearby sold-price match is available for this record. OpenList does not infer an exact property match from an address alone.