Planning application 2660207

For the development of the Slievenalicka wind turbine in the townlands of Tooreen, Slievenalicka…

Tooreen, Slievenalicka, Drumbaun & Lackamore

Current status

Under appeal

Latest milestone

Appeal lodged with An Coimisiún Pleanála

20 Jul 2026

Application timeline

Key milestones

Council and An Coimisiún Pleanála milestones.

  1. Application received

  2. Decision: REFUSED

  3. Appeal lodged with An Coimisiún Pleanála

    Official An Coimisiún Pleanála dataView appeal case

OpenList context

Why this application matters

Wind energy infrastructure

The proposal is for a single wind turbine with a maximum blade-tip height of 150m in the townlands of Tooreen, Slievenalicka, Drumbaun and Lackamore, County Clare. No infrastructure is proposed within Lackamore townland.

Grid connection and site works

Associated infrastructure includes a permanent 38 kV on-site substation with control and welfare building, switchgear, security fencing, underground electrical and communications cabling, drainage and internal access works. The scheme also includes turbine foundations, crane hardstanding, upgraded and new tracks, two borrow pits, a peat repository, a temporary construction compound and tree felling.

Long-term renewable generation

Permission is sought for a 10-year development period and a 35-year operational life from commissioning. An Environmental Impact Assessment Report accompanies the application, and the development is identified as falling within the Renewable Energy Directive III provisions.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
2660207
Council
Clare County Council
Proposal description
For the development of the Slievenalicka wind turbine in the townlands of Tooreen, Slievenalicka, Drumbaun & Lackamore (although no infrastructure will be sited within Lackamore townland), County Clare. The development will consist of: • Construction of 1 wind turbine with a maximum overall blade tip height of 150m. • Construction of associated turbine foundations, crane pad hardstand and assembly areas. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbines to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction & operation of the wind farm. • Two borrow pits. • One peat repository area for peat & spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent & Temporary tree felling to accommodate the construction & operation. • Signages and • All associated site development works. This application is seeking 10-year planning permission, along with a 35-year operational life for the wind farm from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413). The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the planning application and will be submitted to the Planning Authority with the application
Location / address
Tooreen, Slievenalicka, Drumbaun & Lackamore
Application type
PERMISSION
Received / registered
31 Mar 2026
Council decision
REFUSED
Council decision date
3 Jul 2026
Appeal lodged
20 Jul 2026

Location context

Nearby sold prices

OpenList shows sold-price context only where a reliable proximity, Eircode or locality relationship can be established.

Explore sold prices
No reliable nearby sold-price match is available for this record. OpenList does not infer an exact property match from an address alone.