Planning application 2560794

The proposed development, on an overall site of 3.58 hectares, will consist of…

Within the townlands of Woodpark TD and Leitrim TD, near Bridgetown, Co. Clare

Current status

Under appeal

Latest milestone

Appeal lodged with An Coimisiún Pleanála

15 Apr 2026

Application timeline

Key milestones

Council and An Coimisiún Pleanála milestones.

  1. Application received

  2. Decision: CONDITIONAL

  3. Appeal lodged with An Coimisiún Pleanála

    Official An Coimisiún Pleanála dataView appeal case

OpenList context

Why this application matters

Energy storage infrastructure

The proposal is for a co-located battery energy storage system on a 3.58-hectare site in the townlands of Woodpark and Leitrim, near Bridgetown. It includes 32 battery storage units and eight medium-voltage inverter stations.

Wind-farm grid connection

The BESS would connect under the fence to the adjacent Fahy Beg 38kV substation, supported by grid-code equipment including a backup generator, neutral earthing resistor, auxiliary transformer and marshalling kiosks.

Established access relationship

Access is proposed from the R466 through an existing quarry entrance at Leitrim. That entrance is identified as having been permitted for upgrade as part of Fahy Beg Wind Farm under Clare County Council reference 23148 and ACP reference 317227.

Site works and mitigation

The development includes 250 metres of new internal track, drainage and surface-water attenuation ponds, a 75-metre gabion retaining wall, 150 metres of sound-reflective barriers, landscaping and hedgerow reinstatement. It also provides for replacement planting of 109 metres of hedgerow removed for the compound.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
2560794
Council
Clare County Council
Proposal description
The proposed development, on an overall site of 3.58 hectares, will consist of: A co-located Battery Energy Storage System (BESS) Compound with associated internal access tracks; Access to the proposed BESS compound will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded as permitted as part of the Fahy Beg Wind Farm (under Clare County Council Ref: 23148 & ACP Ref 317227); Installation of grid code compliance equipment to facilitate an under-the-fence connection to the adjacent Fahy Beg 38kV substation. The grid code compliance equipment will include: Backup Generator, Neutral Earthing Resistor (NER), Auxiliary House Transformer, Marshalling Kiosks; 3 no. spare parts shipping containers (measuring 12.2 m (L) x 2.4 m (W) x 2.6 m (H)); and Associated ancillary development. Installation of 32 no. Battery Energy Storage Units comprising metal shipping containers housing batteries (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each), and associated ancillary control and ventilation units; Installation of 8 no. Medium Voltage (MV) Inverter Stations comprising metal shipping containers housing the inverter, MV transformer, and an MV-LV room (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each); Installation of 1 no. water storage tank (measuring 5.15 m (L) x 4.15 m(W) x 2.58 m (H)); Construction of 250m of new access tracks; Provision of a crane hardstanding area to facilitate lifting operations on site (280m2); Provision of 10 no. car parking spaces (8 no. standard parking spaces, and 2 no. accessible parking spaces); Reprofiling of the existing cut slope embankment with the erection of a gabion basket retaining wall measuring 75m in length and 2.5m in height, and construction of a reinforced fill slope embankment; Underground electrical and communications cabling; Security lighting, CCTV and communications mast; Provision of 150m of Sound reflective barriers; Security fencing and gates; Drainage system including on-site surface water attenuation ponds; Tree felling of 0.19 Ha (1,890m2) to facilitate required clearance for BESS compound, associated earthworks and drainage infrastructure; Removal of 109m of hedgerow to facilitate development of the BESS compound, and replanting of 109m at perimeter locations; and All associated ancillary site development and vegetation clearance works including landscaping and hedgerow reinstatement. The Applicant requests that the development be
Location / address
Within the townlands of Woodpark TD and Leitrim TD, near Bridgetown, Co. Clare
Application type
PERMISSION
Received / registered
12 Dec 2025
Council decision
CONDITIONAL
Council decision date
19 Mar 2026
Appeal lodged
15 Apr 2026