Planning application 211057
For development in the townlands of Crossmore, Derrynageeha, Ballyduneen, Carrowreagh West, Corraige, Knockalough, Crag…
Crossmore Derrynageeha Ballyduneen Carrowreagh West Corraige Knocklough , Crag Furroor Boolynamweel Illaunatoo or Sorrelisland , Boolynaknockaun Glenmore Booltiagh
Decision
CONDITIONAL
Construction status
Construction commenced
Official building-control evidence dated 27 Nov 2023.
Matched phased building-control records
Source: NBCO/BCMS open data
Application details
- Planning reference
- 211057
- Council
- Clare County Council
- Proposal description
- For development in the townlands of Crossmore, Derrynageeha, Ballyduneen, Carrowreagh West, Corraige, Knockalough, Crag, Furroor, Boolynamweel, Illaunatoo or Sorrelisland, Boolynaknockaun, Glenmore and Booltiagh. The Development will consist of: 1. A 38kV electrical connection over a total of approximately 11km, from the permitted Crossmore Wind Farm (planning ref: P09/123, as extended under planning ref: 19/388 and altered by P20/824) to the existing 110kV Booltiagh substation. This connection will consist of approximately 10km of overhead line and associated 97 no. wooden polesets (single, double and triple structures with approximate heights between 14-19 metres), and approximately 1km of underground cabling. The cable will travel underground within the wind farm site (in the townlands of Cross More and Derrynageeha), underground on private lands (in the townlands of Boolynamweel, Illaunatoo and Boolynaknockaun) and under the public road prior to entering the Booltiagh substation (in the townlands of Boolynaknockaun and Booltiagh). 2. Roads and access arrangements/works consisting of: a) Creation of new permanent access gate into private lands off the L6180 local road; b) Construction of new access roads to facilitate provision of the grid connection, to be retained for permanent use; and c) Upgrade of the existing public road network for turbine delivery including; I. Junction improvement works at the N68 and L6180; II. Widening along the L6180. 3. The proposed development also incorporates construction of the following elements at the site of the permitted 7-turbine Crossmore Wind Farm (ref: P09/123, as extended by P19/388, and altered by P20/824) which will have a 25 year operational lifespan from the date of commissioning: a) Provision of a permanent 38kV substation north of permitted Turbine 5 in lieu of previously approved substation located south of Turbine 2; b) Redesign of permitted turbine hardstand areas consisting of additional temporary hardstand areas for blade storage; c) Provision of 2 no. temporary construction compounds; d) Proposed upgrade of existing access road and proposed new areas of access road between permitted Turbines no. 5 and no. 6, in lieu of permitted upgrade of existing access road between permitted Turbines no. 2 and no. 5; e) All associated underground cabling between permitted turbines and relocated substation, and; To view remainder of description please view newspaper notice.
- Location / address
- Crossmore Derrynageeha Ballyduneen Carrowreagh West Corraige Knocklough , Crag Furroor Boolynamweel Illaunatoo or Sorrelisland , Boolynaknockaun Glenmore Booltiagh
- Application type
- PERMISSION
- Received / registered
- 6 Oct 2021
- Council decision
- CONDITIONAL
- Council decision date
- 7 Apr 2022
- Final grant date
- 13 May 2022
Planning and construction timeline
Key dated milestones from planning, appeal and official building-control records.
Application received
Decision: CONDITIONAL
Final grant
Works commenced
Official NBCO/BCMS dataCompletion certificate validated (1 unit)
Official NBCO/BCMS data
Location context
Nearby sold prices
Recent Property Price Register sales in Carrowreagh West. Distances are not shown because the sale records do not contain reliable coordinates.