3 shownthe development will consist of the construction of telecommunications infrastructure comprised of; a 21-metre monopole support structure carrying antennas, dishes and associated telecommunications equipment, together with new ground level equipment cabinets and all associated site works. The proposal includes the removal of an existing 15 metre monopole (19.9 metre overall structure height) with existing operator equipment to be replaced on the new support structure
Eir Exchange , Shannon Airport , Shannon Co. Clare · 26 Jun 2026
for 1) Construction of a new 540 m2 fully bunded sodium hypochlorite building with a 60 m2 lower mezzanine floor and 10 m2 upper mezzanine floor, including 2No. external underground brine storage tanks; 2) Construction of a new 102 m2 mezzanine floor extension to an existing storage area within an existing warehouse; 3) Construction of a new 32 m2 extension to an existing ESB substation on site; 4) Demolition of an existing internal ramped accessway and removal of 2 No. existing temporary containers off site; 5) All ancillary site development works and services to facilitate the development including drainage, external plant, external pipework to adjacent storage tank and utility connections. The proposed development site is controlled by an Industrial Emissions Licence (Register No. P0076-02) authorised by the Environmental Protection Agency.
Smithstown , Shannon , Co. Clare V14VY67 · 6 Aug 2025
the development will consist of retaining the existing 21.5 metre-high monopole telecommunications structure and PERMISSION to construct a 3.5-metre extension to the existing 21.5 metre-high monopole telecommunications structure (overall height to be 25-metre), carrying antennae and dishes, along with ancillary finial and all ancillary works
ESB Telecoms Ltd. Compound , ESB Cratloe 38kV Substation , Ballymorris Shannon Co. Clare · 20 Jun 2025