Large residential
6 shownfor the construction of 55 dwelling units including: 12 no. two-bedroom semi-detached houses, 1 no. detached two-bedroom house, 30 no. three-bedroom semi-detached houses, 6 no. four-bedroom semi-detached houses , 6 no. four- bedroom semi-detached bungalows, Together with all associated site works including internal access roads, retaining walls, landscaping, boundary treatments, parking (97 no. spaces), footpaths, public open spaces, and connections to existing services. Access is off the existing Fortvillage and Ringview housing development road layout. The application site comprises approx. 3.19 hectares located south of Fort Village and north of Willow Ridge, Gortnakesh, Cavan Town, Co. Cavan. A Natura Impact Statement (NIS) will be summitted to the planning authority with this application - SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
Gortnakesh , Fort Village , Cavan Town. · 24 Mar 2026
for the construction of 55 dwelling units including: 12 no. two-bedroom semi-detached houses, 1 no. detached two-bedroom house, 30 no. three-bedroom semi-detached houses, 6 no. four-bedroom semi-detached houses , 6 no. four- bedroom semi-detached bungalows, Together with all associated site works including internal access roads, retaining walls, landscaping, boundary treatments, parking (97 no. spaces), footpaths, public open spaces, and connections to existing services. Access is off the existing Fortvillage and Ringview housing development road layout. The application site comprises approx. 3.19 hectares located south of Fort Village and north of Willow Ridge, Gortnakesh, Cavan Town, Co. Cavan. A Natura Impact Statement (NIS) will be summitted to the planning authority with this application
Gortnakesh , Fort Village , Cavan Town. · 11 Feb 2026
for the construction of 55 dwelling units including: 12 no. two-bedroom semi-detached houses, 1 no. detached two-bedroom house, 30 no. three-bedroom semi-detached houses, 6 no. four-bedroom semi-detached houses , 6 no. four-bedroom semi-detached bungalows, Together with all associated site works including internal access roads, retaining walls, landscaping, boundary treatments, parking (97 no. spaces), footpaths, public open spaces, and connections to existing services. Access is off the existing Fortvillage and Ringview housing development road layout. The application site comprises approx. 3.19 hectares located south of Fort Village and north of Willow Ridge, Gortnakesh, Cavan Town, Co. Cavan. A Natura Impact Statement (NIS) will be summitted to the planning authority with this application
Gortnakesh , Fort Village , Cavan Town · 30 Jan 2026
for Large Scale Residential Development consististing of the provision of a total of 109no. residential units along with provision of a crèche. Particulars of the development comprise as follows: (a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works. (b) The provision of a total of 65no. residential dwellings which will consist of 23no. 2 bed units, 26no. 3 bed units and 16no. 4 bed units. (c) The provision of a total of 44no. duplex apartment units consisting of 8no.1 bed units, 18no. 2bed units and 18no. 3 bed units. The duplex apartment units range in height from two storey to three storey. (d) Provision of a two storey creche with associated parking, bicycle and bin storage. (e) Provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche and duplex apartment units. (f) Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site. (g) Provision of associated bicycle, bin and bulky items storage facilities for duplex apartment units. (h) Upgrading the existing access point from Loreto Road with associated works to include for provision of a right turning lane, provide for internal access roads, footpaths and associated site works. (i) Provision of internal access roads and footpaths and associated works to include for regrading of site levels as required along with connections onto the Greenway. (j) Provision of residential communal open space and public open space areas to include formal play areas along with all hard and soft landscape works with public lighting, planting and boundary treatments to include boundary walls, railings & fencing. (k) Internal site works and attenuation systems which will include for provision of hydrocarbon and silt interceptors prior to discharge. (l) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul sewer, water connections and ESB network connections along with provision of an ESB substation. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application - SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
Lands at Lisdaran Townland , Loreto Road , Cavan Town · 13 Nov 2025
for Large Scale Residential Development consististing of the provision of a total of 109no. residential units along with provision of a crèche. Particulars of the development comprise as follows: (a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works. (b) The provision of a total of 65no. residential dwellings which will consist of 23no. 2 bed units, 31no. 3 bed units and 12no. 4 bed units. The dwelling types range from detached units to terrace units and are 2storey. (c) The provision of a total of 44no. duplex apartment units consisting of 8no.1 bed units, 18no. 2bed units and 18no. 3 bed units. The duplex units range in height from 2storey to 3storey. (d) Provision of a two storey creche with associated parking, bicycle and bin storage. (e) Provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche and duplex apartment units. (f) Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site. (g) Provision of associated bicycle storage facilities at surface level throughout the site and bin storage facilities. (h) Upgrading the existing access point from Loreto Road with associated works to include for provision of a right turning lane, provide for internal access roads, footpaths and associated site works. (i) Provision of internal access roads and footpaths and associated works to include for regrading of site levels as required. (j) Provision of residential communal open space and public open space areas to include formal play areas along with all hard and soft landscape works with public lighting, planting and boundary treatments to include boundary walls, railings & fencing. (k) Internal site works and attenuation systems which will include for provision of hydrocarbon and silt interceptors prior to discharge. (l) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul via a rising main and provision of a foul pumping station, water connections and ESB network connections A Natura Impact Statement (NIS) has been prepared and accompanies this application
Lands at Lisdaran Townland , Loreto Road , Cavan Town · 29 Oct 2025
for the provision of a total of 134no. residential units along with provision of a crèche. Particulars of the development comprise as follows: (a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works. (b) The provision of a total of 109no. residential dwellings which will consist of 6no. 1bed units, 39no. 2 bed units, 59no. 3 bed units and 5no. 4 bed units. The residential dwellings range in height from one to two storeys. (c) The provision of a total of 25no. duplex apartment units consisting of 15no.1 bed units and 10no. 2bed units. The duplex apartment units range in height from two to three storeys. (d) Provision of a single storey creche with associated parking, bicycle and bin storage. (e) Provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche and duplex apartment units. (f) Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site. (g) Provision of associated bicycle storage facilities at surface level throughout the site and bin storage facilities. (h)The provision of an internal culvert along with decommissioning of existing drainage channel within the site. Culvert works to include for provision of a headwall at the outfall to the watercourse. (i) Creation of a new access point from the public road with associated works to include for a connections to the existing public footpath along with a pedestrian crossing point. (j) Provision of internal access roads and footpaths and associated works to include for regrading of site levels as required. (k) Provision of residential communal open space and public open space areas to include formal play areas along with all hard and soft landscape works with public lighting, planting and boundary treatments to include boundary walls, railings & fencing. (l) Internal site works and attenuation systems which will include for provision of a hydrocarbon and silt interceptor prior to discharge. (m) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul via a rising main and provision of a foul pumping station, water connections and ESB network connection to include for provision of a substation. A Natura Impact Statement (NIS) has been prepared
Lands at Billis and Drumalee Townlands , Cootehill Road , Cavan Town · 25 Feb 2025