Planning application 2660287
Kellistown East Battery Energy Storage Facility
Kellistown East, Co. Carlow
Application timeline
Key milestones
Key dated milestones from the planning record.
Application received
Decision due
Target dateCurrent decision target recorded by the council.
OpenList context
Why this application matters
Energy storage scheme
The proposal is for a battery energy storage system on a circa 6.5-hectare site at Kellistown East, comprising 210 BESS units, 30 smart transformer stations and 60 distribution transformers.
Grid infrastructure
A tail-fed 220kV step-up transformer, auxiliary transformer and Independent Power Producer building with switchgear rooms are proposed, with underground electrical and communications cabling within private lands.
Site works and safety
Works include an upgraded entrance, internal access tracks, a temporary construction compound, security fencing and cameras, landscaped berms, and firewater storage and retention infrastructure.
Long-term operation
The development seeks a 40-year operational life following full commissioning, followed by decommissioning; a Natura Impact Statement accompanies the application.
OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.
Application details
- Planning reference
- 2660287
- Council
- Carlow County Council
- Proposal description
- A 10-year permission for the development. The development will consist of the construction of BESS, tail-fed 220kV step-up transformer and all associated ancillary development on ca.6.5 hectare (‘ha’) site consisting of: (i) 210 BESS units each containing six power conversion system units; (ii) 30 static smart transformer stations units; (iii) 60 distribution transformers units; (iv) one auxiliary services building; (v) one office building; (vi) one control building; (vii) one storage building; (viii) one tail-fed 220 kV step-up transformer; (ix) one auxiliary transformer; (x) one Independent Power Producer (‘IPP’) building with two switchgear rooms and auxiliary systems; (xi) one underground firewater retention holding tank (ca.350m³ capacity); (xii) one firewater tank (ca.250m³ capacity); (xiii) one infiltration basin (ca.1,689m³ capacity); (xiv) upgrade works to the existing Site entrance; (xv) internal access tracks between the BESS units, IPP Building and Site entrance; (xvi) underground electrical and communications cabling within private lands; (xvii) one temporary construction compound; (xviii) landscaped berms of up to ca.3m in height; (xix) perimeter security fencing of up to 2.4m in height and security gates; (xx) pole-mounted security cameras; and (xxi) all associated ancillary site development, landscaping and reinstatement works. A 40-year operational life from the date of full commissioning of the entire BESS project is being sought for the proposed development (other than temporary works specified above), and the subsequent decommissioning. A Natura Impact Statement will accompany the planning application
- Location / address
- Kellistown East, Co. Carlow
- Applicant
- KLT BESS Limited
- Application type
- PERMISSION
- Received / registered
- 18 Sept 2026
- Valid date
- 18 Sept 2026