Planning application 2113
Seven-Turbine Wind Farm, Rossacurra, Co. Carlow
Rossacurra Cranemore Kilbrannish North Bealalaw Raheenliegh Aclare Co. Carlow
Current status
Under appeal
Council status: APPLICATION FINALISED
Latest milestone
Appeal lodged with An Coimisiún Pleanála
15 Dec 2023
Application timeline
Key milestones
Council and An Coimisiún Pleanála milestones.
Application received
Decision: REFUSED
Appeal lodged with An Coimisiún Pleanála
Official An Coimisiún Pleanála dataView appeal caseAppeal decision: Refuse Permission
Official An Coimisiún Pleanála dataView appeal caseAppeal lodged with An Coimisiún Pleanála
Official An Coimisiún Pleanála dataView appeal case
Application details
- Planning reference
- 2113
- Council
- Carlow County Council
- Proposal description
- Permission to develop a wind farm and associated works . The proposed development will consist of: - Construction of up to 7 no. wind turbines with a maximum overall blade tip height of up to 178m; - Construction of turbine foundations and crane pad hardstanding areas; - Construction of new site tracks and associated drainage infrastructure; - Upgrading of existing tracts and associated drainage infrastructure where necessary including upgrade of entrance onto L2026; - All associated drainage and sediment control including the installation of new watercourse or drain crossings and the re-use or upgrading of existing internal watercourse and drain crossings; - Construction of 1 no. permanent onsite 38kV electrical substation to ESBN specifications including: Control building with welfare facilities; - Electrical infrastructure; - Parking; - Wastewater holding tank; - rainwater harvesting; - Security fencing; - All associated infrastructure, services and site works; - 1 no. temporary construction site compound and associated ancillary infrastructure including parking; - 1 no. on site borrow pit (the borrow pit shall be accessed via wind farm access tracks); - Tree felling to facilitate construction and operation of the proposed development; - Installation of medium voltage (20/33kV) and communication underground cabling between the proposed turbines and the proposed on-site substation and associated ancillary works; - Erection of 1 no. permanent meteorological mast to a maximum height of 100m above ground level; - Upgrade of existing forest tracks and paths that shall be re-purposed as recreational amenity trails for community use including signage; - All associated site development works; - A 10 year planning permission and 35 year operational life from the date of commissioning of the entire wind farm. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the application.
- Location / address
- Rossacurra Cranemore Kilbrannish North Bealalaw Raheenliegh Aclare Co. Carlow
- Application type
- PERMISSION
- Received / registered
- 22 Jan 2021
- Valid date
- 22 Jan 2021
- Council status
- APPLICATION FINALISED
- Council decision
- Refused
- Council decision date
- 18 Mar 2021
- Appeal lodged
- 15 Dec 2023
Location context
Nearby sold prices
OpenList shows sold-price context only where a reliable proximity, Eircode or locality relationship can be established.
No reliable nearby sold-price match is available for this record. OpenList does not infer an exact property match from an address alone.