Planning applications

2661265

8 Jul 2026

A PERIOD OF 10 YEARS FOR PROPOSED WORKS TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE PERMITTED OWENINNY WIND FARM PHASE 3 (REF. NO. PA16.316178). THE TURBINE DELIVERY ROUTE (TDR) WILL ORIGINATE AT THE PORT OF ENTRY AT KILLYBEGS HARBOUR, CO. DONEGAL, RUN THROUGH CO. SLIGO, CO. LEITRIM AND TERMINATE AT THE CONSENTED OWENINNY WIND FARM PHASE 3 SITE, CO. MAYO. THE TOTAL LENGTH OF THE TDR IS C.188KM OF WHICH C.65KM IS WITHIN CO. DONEGAL, C.57KM IN CO. SLIGO, AND C.36KM IN CO. MAYO. MINOR TEMPORARY AND PERMANENT WORKS ARE NOT PROPOSED ALONG THIS ENTIRE ROUTE BUT ONLY AT SELECT LOCATIONS. THE TOTAL AREA REQUIRED FOR THE WORKS IN CO. DONEGAL IS C.0.2HA. THE DEVELOPMENT WITHIN CO. DONEGAL COMPRISES MINOR TEMPORARY WORKS IN THE TOWNLANDS OF KILLYBEGS, GLEBE, AGHAYEEVOGE, CASHELREAGH GLEBE, BRUCKLESS, AIGHAN, BRUCKLESS AND DARNEY. THESE WORKS ARE REQUIRED TO ACCOMMODATE DELIVERY OF ABNORMAL INDIVISIBLE LOADS (AIL) AND WILL CONSIST OF (1) LAYING OF TEMPORARY LOAD BEARING SURFACE AT 5 NO. LOCATIONS, (2) TEMPORARY FENCE REMOVAL, TEMPORARY REMOVAL AND RELOCATION OF LIGHTS AT 1 NO. LOCATION, (3) TEMPORARY REMOVAL OF BOLLARD AT 1 NO. LOCATION, (4) TEMPORARY REMOVAL OF GATE, WALL AND CHEVRONS AT 1 NO. LOCATION, (5) TEMPORARY REMOVAL OF ROAD SIGNALS, BOLLARDS, LIGHTING COLUMNS, WALL AND FENCE AT 1 NO. LOCATION AS WELL AS HEDGEROW AND TREE TRIMMING, (6) TEMPORARY REMOVAL OF FENCE AND VEGETATION AT 1 NO. LOCATION, (7) TEMPORARY REMOVAL OF HEDGEROWS, FENCE AND WALL AT 1 NO. LOCATION, (8) REINSTATEMENT OF ALL TEMPORARY WORKS AREAS TO PREVIOUS CONDITION AND (10) ALL ASSOCIATED AND ANCILLARY WORKS REQUIRED FOR THE PROPOSED TDR. SEPARATE APPLICATIONS WILL BE MADE TO BOTH SLIGO AND MAYO COUNTY COUNCILS IN RESPECT OF WORKS REQUIRED AT LOCATIONS WITHIN EACH COUNTY BOUNDS. MINOR TEMPORARY WORKS IN SLIGO ARE PROPOSED AT CARROWNACREEVY, TANREGO WEST, ABBEYTOWN, CORHAWNAGH AND CARRICKNAGAT. PERMANENT WORKS ARE PROPOSED AT CARRICKNAGAT. MINOR TEMPORARY WORKS IN MAYO ARE PROPOSED AT LECARROW, CROSSMOLINA, ABBEYTOWN, KNOCKALEGAN, GLEBE, GORTSKEDDIA, BALLINA, ABBEYHALFQUARTER, KNOCKNALYRE AND BUNREE. PERMANENT WORKS ARE PROPOSED AT CROSSMOLINA. AN APPROPRIATE ASSESSMENT SCREENING REPORT (AASR) AND NATURA IMPACT STATEMENT (NIS) ACCOMPANY THIS APPLICATION

KILLYBEGS GLEBE AGHAYEEVOGE CASHELREAGH GLEBE BRUCKLESS AIGHAN BRUCKLESS & DARNEY , DONEGAL PO , CO. DONEGAL

2661202

30 Jun 2026

PROPOSED WORKS TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE PERMITTED OWENINNY WIND FARM PHASE 3 (REF. NO. PA16.316178). THE TURBINE DELIVERY ROUTE (TDR) WILL ORIGINATE AT THE PORT OF ENTRY AT KILLYBEGS HARBOUR, CO. DONEGAL, RUN THROUGH CO. SLIGO, CO. LEITRIM AND TERMINATE AT THE CONSENTED OWENINNY WIND FARM PHASE 3 SITE, CO. MAYO. THE TOTAL LENGTH OF THE TDR IS C.188KM OF WHICH C.65KM IS WITHIN CO. DONEGAL, C.57KM IN CO. SLIGO, AND C.36KM IN CO. MAYO. MINOR TEMPORARY AND PERMANENT WORKS ARE NOT PROPOSED ALONG THIS ENTIRE ROUTE BUT ONLY AT SELECT LOCATIONS. THE TOTAL AREA REQUIRED FOR THE WORKS IN CO. DONEGAL IS C.0.2HA. THE DEVELOPMENT WITHIN CO. DONEGAL COMPRISES MINOR TEMPORARY WORKS IN THE TOWNLANDS OF KILLYBEGS, GLEBE, AGHAYEEVOGE, CASHELREAGH GLEBE, BRUCKLESS, AIGHAN, BRUCKLESS AND DARNEY. THESE WORKS ARE REQUIRED TO ACCOMMODATE DELIVERY OF ABNORMAL INDIVISIBLE LOADS (AIL) AND WILL CONSIST OF (1) LAYING OF TEMPORARY LOAD BEARING SURFACE AT 5 NO. LOCATIONS, (2) TEMPORARY FENCE REMOVAL, TEMPORARY REMOVAL AND RELOCATION OF LIGHTS AT 1 NO. LOCATION, (3) TEMPORARY REMOVAL OF BOLLARD AT 1 NO. LOCATION, (4) TEMPORARY REMOVAL OF GATE, WALL AND CHEVRONS AT 1 NO. LOCATION, (5) TEMPORARY REMOVAL OF ROAD SIGNALS, BOLLARDS, LIGHTING COLUMNS, WALL AND FENCE AT 1 NO. LOCATION AS WELL AS HEDGEROW AND TREE TRIMMING, (6) TEMPORARY REMOVAL OF FENCE AND VEGETATION AT 1 NO. LOCATION, (7) TEMPORARY REMOVAL OF HEDGEROWS, FENCE AND WALL AT 1 NO. LOCATION, (8) REINSTATEMENT OF ALL TEMPORARY WORKS AREAS TO PREVIOUS CONDITION AND (10) ALL ASSOCIATED AND ANCILLARY WORKS REQUIRED FOR THE PROPOSED TDR. PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS AND SEPARATE APPLICATIONS WILL BE MADE TO BOTH SLIGO AND MAYO COUNTY COUNCILS IN RESPECT OF WORKS REQUIRED AT LOCATIONS WITHIN EACH COUNTY BOUNDS. MINOR TEMPORARY WORKS IN SLIGO ARE PROPOSED AT CARROWNACREEVY, TANREGO WEST, ABBEYTOWN, CORHAWNAGH AND CARRICKNAGAT. PERMANENT WORKS ARE PROPOSED AT CARRICKNAGAT. MINOR TEMPORARY WORKS IN MAYO ARE PROPOSED AT LECARROW, CROSSMOLINA, ABBEYTOWN, KNOCKALEGAN, GLEBE, GORTSKEDDIA, BALLINA, ABBEYHALFQUARTER, KNOCKNALYRE AND BUNREE. PERMANENT WORKS ARE PROPOSED AT CROSSMOLINA. AN APPROPRIATE ASSESSMENT SCREENING REPORT (AASR) AND NATURA IMPACT STATEMENT (NIS) ACCOMPANY THIS APPLICATION

KILLYBEGS GLEBE AGHAYEEVOGE CASHELREAGH GLEBE BRUCKLESS AIGHAN BRUCKLESS & DARNEY , DONEGAL PO , CO. DONEGAL

2660259

30 Jun 2026

Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted Oweninny Wind Farm Phase 3 (Ref. PA16.316178). The Turbine Delivery Route (TDR) will originate at the port of entry at Killybegs Harbour, Co. Donegal, runs through Co. Sligo, Co. Leitrim and terminate at the consented Oweninny Wind Farm Phase 3 site, Co. Mayo. The total length of the TDR is c.188km of which c.65km is within Co. Donegal, c.57km in Co. Sligo, and c.36km in Co. Mayo. Minor temporary and permanent works are not proposed along this entire route but only at select locations. The total area of the works proposed in Co. Sligo is 0.49 Hectares (Ha). The proposed development within the Sligo County bounds comprises both temporary and permanent works located in the townlands of Carrownacreevy, Tanrego West, Abbeytown, Corhawnagh and Carricknagat. The works are required to accommodate delivery of Abnormal Indivisible Loads (AIL) and will consist of: • Laying of temporary load bearing surfaces at 1No. location. • Temporary removal of one traffic signal, three road signs, one bollard, one pole, a bridge railing, pedestrian guardrail and wall.at 1 No. location • Temporary removal of a wall, fence, poles and vegetation at 1No. location. • Construction of a permanent slip road linking the N4 and R290 at Carricknagat. • Removal of rock outcrop at Carricknagat including trees and vegetation clearance. Laying of a load bearing surface including associated drainage and reinstatement works. • Installation of temporary construction compound at Carricknagat to include site offices, welfare facilities and car parking. • Reinstatement of all temporary works areas to previous condition. • All associated and ancillary works required for the accommodation works and construction for the TDR. Permission is sought for a period of 10 years. Separate applications will be made to both Donegal and Mayo County Councils in respect of works required at locations within each county bounds. Minor, temporary works in Donegal are proposed at Killybegs, Glebe, Aghayeevoge, Cashelreagh Glebe, Bruckless, Aighan, Bruckless and Darney. Minor, temporary works in Mayo are proposed at Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree. Permanent works are proposed at Crossmolina. An Appropriate Assessment Screening Report (AASR

Carrownacreevy Tanrego West Abbeytown Corhawnagh and Carricknagat , Carrownacreevy Tanrego West Abbeytown Corhawnagh and Carricknagat , Co. Sligo