5 results shown for “Ballytobin

Places

Properties / addresses

No matching property addresses found.

Planning applications

2660395

24 Jun 2026

is being sought for the existing Anaerobic Digester biogas facility at Camphill Ballytobin that received planning permission 1996 and was constructed and commissioned in 1998. (planning reference number 9698) Aspects of the facility that were constructed were at variance with the original permission set of drawings and retention is sought to rectify this.

BEOFS , Camphill Ballytobin , Callan

2660316

26 May 2026

for a 10-Year planning permission for development at this site located in the townlands of Ballytobin & Ballyhall, County Kilkenny. The development will consist of the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning. The Development consists of works within the curtilage of Ballytobin House, a protected structure, reference ‘C315’ as listed on the County Kilkenny Record of Protected Structures. This Planning Application is not subject to a Natura Impact Statement (NIS) or Environmental Impact Assessment Report (EIAR). This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Ballytobin & Ballyhall , Co. Kilkenny , Ireland

2660259

1 May 2026

for the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning. This Planning Application is not subject to a Natura Impact Statement (NIS) or Environmental Impact Assessment Report (EIAR).

Ballytobin & Ballyhall , Co. Kilkenny

2660246

24 Apr 2026

We, ART Generation Limited, intend to apply for a 10-Year planning permission for development at this site located in the townlands of Ballytobin & Ballyhall, County Kilkenny. The development will consist of the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning.

Ballytobin , Co. Kilkenny , Ireland