OpenList search

Search property intelligence

Search an address, area, Eircode or planning reference across sold-price and planning information.

10 results shown for “Ballycasey

Places

Properties / addresses

No matching property addresses found.

Planning applications

2660446

9 Jul 2026

the proposed development consists of the provision of corporate back-lit signage in the form of a new advertisement structure at ground level to be placed at the north-east side of the roundabout on the Smithstown Road and at the entrance to Shannon Airport Business Park – East. The signage proposal is intended to replicate signage proposals submitted under Clare County Council planning application reference P25-60656 at the opposite side of the roundabout

Smithstown Road , Ballycasey More , Shannon Co. Clare

2660423

1 Jul 2026

for the development at this site at the Townlands of, Mogullaan, Crossagh, Rathlaheen South, Culleen, Drumline, and Ballycasey Beg, Co.Clare. The proposed development will consist of an amendment to a previously consented development (Planning Reference 25260 by Clare County Council) comprising of; (i) the construction of a new operational entrance in the most eastern field, (ii) internal access track reorientation in the most eastern field. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the planning authority during its public opening hours. A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee, €20, within the period of — a) 5 weeks, or b) 2 weeks, in the case of a planning application for small-scale solar energy equipment development or development that is the installation of a small-scale non-ground source heat pump, beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions or may refuse to grant permission. For this application the submission period is 5 weeks beginning on the date of receipt by the authority of the application.

Mogullaan Crossagh Rathlaheen South Culleen Drumline and Ballycasey Beg , Newmarket-on-Fergus , Co. Clare

2660406

22 Jun 2026

of a portacabin originally granted under planning reference no. P16/253 and Subsequently granted Retention permission under planning reference no. P21/631. We also intend to apply for retention permission for outdoor disabled access toilet, laundry shed and three number outdoor pods which were required to satisfy the Covid 19 regulations originally granted under planning reference no. P21/631 including ancillary site works

8 An Ros An Oir , Ballycasey , Shannon Co. Clare

2660095

24 Feb 2026

for the following development: (a) Construction of side extension to existing dwelling house for the purpose of ancillary living accommodation; (b) RETENTION of private garage/ workshop to rear of dwelling house; (c) All associated site works and services

1 Ballycasey Court , Shannon , Co. Clare V14 YP11

2561195

17 Nov 2025

the construction of a new dwelling house, detached domestic garage entrance, driveway, packaged wastewater unit and percolation area and all ancillary site works

Ballycasey , Kildimo , Co. Limerick.

25335

29 Oct 2025

to construct a single storey extension to the side and rear of existing dwelling house, with all associated site works

No. 36 Lios Rua , Ballycasey More , Shannon Co Clare

2560656

24 Oct 2025

for proposed development which will consist of the construction of a light industrial manufacturing facility with ancillary office space measuring circa 3,630m² comprising, A. a naturally lit high-bay workspace and a two-storey annex comprising administration and office spaces, sanitary and staff welfare facilities, B. The provision of external public lighting, a standalone ESB substation and switch room building, an enclosed external building services enclosure and an enclosed waste storage compound, C. Two new site entrances from the perimeter public roadways; a HGV entrance from the north off Smithstown Road to a dedicated goods yard and a second entrance from the east for all other vehicles, D. Parking for 76 cars, of which 17 are EV Charging spaces and 4 are Universal Access spaces, 38 bicycles under a covered shelter and a vehicular set-down zone, E. New ground level corporate signage to be placed at the south-west side of the adjacent roundabout on the Smithstown Road, F. Roof and ground mounted photovoltaic panels, building signage, ancillary soft and hard landscaping and all associated site works and services. The planning application is accompanied by a Natura Impact Statement

Smithstown Road , Ballycasey More , Shannon Co. Clare

2560587

25 Sept 2025

for the demolition of part of road boundary wall and modify existing kerb to construct new vehicular entrance to existing dwelling including ancillary site works

13 Ballycasey Close , Ballycasey More , Shannon Co. Clare V14 KD26