Planning in Ireland

Sligo planning applications

Search the latest year of Sligo County Council planning applications by location, reference, development, applicant or status.

Sold prices in Sligo
Clear

Matching applications

379 planning applications match the selected filters.

Clear filters

These records do not include usable map coordinates.

2660275

7 Jul 2026

Status: NEW APPLICATION

We ArchEngTech Consulting Ltd on behalf of Premier Housing Limited, are applying to Sligo County Council for planning permission for the construction of 12 No. dwelling houses, 4 maisonette apartments and 13 No. apartments in a three storey apartment block, renovation and conversion of existing two-storey building with car parking and green area, total existing building area of circa 418.31m² and the use of this building for residential accommodation to include interior alterations, new internal partitions, alterations to window and door openings on the front, rear and side elevations, external communal areas; demolition of external sheds circa 60.43m2 and 16.86m2, external tank of circa 9.57m2, and demolition of external storage of circa 9.73m2 and external garage of circa 16.82m2 both adjoining to existing Convent, and all associated site works, to the property and building known as ‘Convent of Mercy’, Lower Main Street, Collooney, Co. Sligo. The Main Building of the Convent of Mercy is a Protected Structure NIAH Ref. No. 32310011 and RPS 151 CDP on the record of Protected Structures of the Sligo County Development Plan 2024-2030. The site also contains a Walled Garden with Ref. No. SL026-170, which is listed in the nation RMP register The proposed development will consist of: 1. permission to complete renovations and alterations to the Convent of Mercy main building, the original Protected Structure 2. Conversion and use of the Ground and First floor of the main Convent of Mercy Protected Structure for 6 no. residential units consisting of 1 No. x 2 bed apartments and 5 No. x 1 bed apartments along with all associated works. 3. permission to construct 16 No. residential units consisting of 4 No. x 1 bed maisonette apartments and 12 No. x 3 bed dwelling houses along with all associated works. 4. permission to construct a new 3 storey block of apartments containing 13 No. residential units consisting of 3 No. x 2 bed apartments and 10 No. x 1 bed apartments along with all associated works. 5. Carry out all associated elevational changes, including the localised repair of the roof area on the protected structure, together with all associated site works including the provision of new walls, common areas, private amenity and common amenity space, walkways, pathways and roadways throughout the property including the delineation of external car parking areas. There will not be any increase in the floor area of the existing buildings.

Sligo County Council

Convent of Mercy Collooney , Lower Main St Collooney , Co. Sligo

Application type: PERMISSIONDecision: N/A
View application details

2660268

3 Jul 2026

Status: NEW APPLICATION

2660266

2 Jul 2026

Status: NEW APPLICATION

2660259

30 Jun 2026

Status: INCOMPLETED APPLICATION

Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted Oweninny Wind Farm Phase 3 (Ref. PA16.316178). The Turbine Delivery Route (TDR) will originate at the port of entry at Killybegs Harbour, Co. Donegal, runs through Co. Sligo, Co. Leitrim and terminate at the consented Oweninny Wind Farm Phase 3 site, Co. Mayo. The total length of the TDR is c.188km of which c.65km is within Co. Donegal, c.57km in Co. Sligo, and c.36km in Co. Mayo. Minor temporary and permanent works are not proposed along this entire route but only at select locations. The total area of the works proposed in Co. Sligo is 0.49 Hectares (Ha). The proposed development within the Sligo County bounds comprises both temporary and permanent works located in the townlands of Carrownacreevy, Tanrego West, Abbeytown, Corhawnagh and Carricknagat. The works are required to accommodate delivery of Abnormal Indivisible Loads (AIL) and will consist of: • Laying of temporary load bearing surfaces at 1No. location. • Temporary removal of one traffic signal, three road signs, one bollard, one pole, a bridge railing, pedestrian guardrail and wall.at 1 No. location • Temporary removal of a wall, fence, poles and vegetation at 1No. location. • Construction of a permanent slip road linking the N4 and R290 at Carricknagat. • Removal of rock outcrop at Carricknagat including trees and vegetation clearance. Laying of a load bearing surface including associated drainage and reinstatement works. • Installation of temporary construction compound at Carricknagat to include site offices, welfare facilities and car parking. • Reinstatement of all temporary works areas to previous condition. • All associated and ancillary works required for the accommodation works and construction for the TDR. Permission is sought for a period of 10 years. Separate applications will be made to both Donegal and Mayo County Councils in respect of works required at locations within each county bounds. Minor, temporary works in Donegal are proposed at Killybegs, Glebe, Aghayeevoge, Cashelreagh Glebe, Bruckless, Aighan, Bruckless and Darney. Minor, temporary works in Mayo are proposed at Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree. Permanent works are proposed at Crossmolina. An Appropriate Assessment Screening Report (AASR

Sligo County Council

Carrownacreevy Tanrego West Abbeytown Corhawnagh and Carricknagat , Carrownacreevy Tanrego West Abbeytown Corhawnagh and Carricknagat , Co. Sligo

Application type: PERMISSIONDecision: N/A
View application details

2660258

30 Jun 2026

Status: NEW APPLICATION

2660256

29 Jun 2026

Status: NEW APPLICATION

2660255

29 Jun 2026

Status: NEW APPLICATION

2660251

29 Jun 2026

Status: NEW APPLICATION

Applications by area

Top Sligo localities in the imported the latest year.

Enniscrone
Rosses Point
Ballymote
Calry
Ballinfull
Ballintogher
Grange
Sligo
Strandhill
Tubbercurry
Ballisodare
Geevagh

Monthly registrations

Recent application volume by registration month.

Aug 202520
Sept 202528
Oct 202539
Nov 202535
Dec 202548
Jan 202627
Feb 202631
Mar 202631
Apr 202631
May 202630
Jun 202641
Jul 202618

Areas in Jul 2026

Localities with the most applications in the latest registration month.

Geevagh
Curry
(Adjacent )
Ballinfull
Ballisodare
Ballyconnell
Easkey
Enniscrone

Status in Jul 2026

Current status mix for applications registered in the latest month.

NEW APPLICATION
INCOMPLETED APPLICATION
WITHDRAWN

Types in Jul 2026

Most common application types registered in the latest month.

PERMISSION

Planning activity and trends

Based on the latest 12 months of imported planning data for this council.

Applications

379

Latest registered

14 Jul 2026

Most active area

Enniscrone

Most common type

PERMISSION

Latest month apps

18

Month change

-23

Monthly trend

Jul 2026

-23

012243648Aug 25Feb 26Jul 26

Area overview

Enniscrone accounts for 13%

Enniscrone13%
Rosses Point12%
Ballymote10%
Calry8%
Ballinfull8%
Ballintogher8%

Status mix

APPLICATION FINALISED accounts for 54%

APPLICATION FINALISED54%
INCOMPLETED APPLICATION14%
NEW APPLICATION9%
DECISION MADE8%

Application types

PERMISSION accounts for 100%

PERMISSION100%