Planning application 2360108
Development will consist of alterations to an existing whiskey maturation storage building (permitted under PL15/296)…
Lough Gill Distillery , Hazelwood Demesne , Co. Sligo.
Decision
CONDITIONAL
Construction status
Construction commenced
Official building-control evidence dated 19 Nov 2025.
Matched phased building-control records
Source: NBCO/BCMS open data
Application details
- Planning reference
- 2360108
- Council
- Sligo County Council
- Proposal description
- Development will consist of alterations to an existing whiskey maturation storage building (permitted under PL15/296) and will include the following works including any associated site development works: 1) Demolition of a section of the existing building to create a fire break and form a standalone whiskey maturation storage building, 2) modifications to the standalone whiskey maturation storage building which will include, a) lowering the existing high-level roof on the eastern side of the building, b) removing the existing brick cladding on the western and southern façades, c) elevational alteration with the addition of new fire escapes and roller shutter doors, d) the addition of external cladding and louvred vents to the exterior walls, 3) the construction of a sprinkler valve house extension (floor area of 4.0 m²) and sprinkler valve house/electrical room extension (floor area of 10.3 m²) to the western elevation, 4) the construction of a sprinkler valve house extension (floor area of 6.0 m²) to the eastern elevation, 5) construct a forklift charging building (floor area of 85.8 m²), 6) provide a sprinkler tank and sprinkler pump house building (floor area of 96.0 m²), 7) deepen sprinkler water and spillage run off retention pond permitted under PL20/180 to increase the retention volume, 8) provision of 2 no. boreholes to supply process water for the existing whiskey production and potable water for staff welfare facilities including pipelines and ancillary works and therefore amendment of Condition no.14 of PL15/296. The proposed development is located on the grounds of Hazelwood House containing two protected structures (RPS No. 292SE and RPS No. 293SE) and will involve the carrying out of works to and within the curtilage of the protected structures. The application will be accompanied by a Natura Impact Statement.
- Location / address
- Lough Gill Distillery , Hazelwood Demesne , Co. Sligo.
- Application type
- PERMISSION
- Received / registered
- 9 May 2023
- Council decision
- CONDITIONAL
- Council decision date
- 29 Jun 2023
- Final grant date
- 9 Aug 2023
Planning and construction timeline
Key dated milestones from planning, appeal and official building-control records.
Application received
Decision: CONDITIONAL
Final grant
Works commenced
Official NBCO/BCMS data
Location context
Nearby sold prices
Recent Property Price Register sales in Hazelwood. Distances are not shown because the sale records do not contain reliable coordinates.
€465,000
BOULEVARD, HAZELWOOD, SLIGO
Sold 6 Mar 2025
Locality match
€490,000
KILTYCAHILL, HAZELWOOD, SLIGO
Sold 31 May 2024
Locality match
€290,000
HAZELWOOD, SLIGO
Sold 21 Mar 2024
Locality match
€405,000
WOODHAVEN, HAZELWOOD, SLIGO
Sold 25 Nov 2021
Locality match
€420,000
KILTYCAHILL, HAZELWOOD, CO. SLIGO
Sold 23 Jan 2019
Locality match
€80,000
HAZELWOOD AVE, HAZELWOOD, SLIGO
Sold 21 Aug 2017
Locality match

