Battery storage
5 shownpermission for the construction of an electricity storage facility comprising a Battery Energy Storage System (BESS), within a total site area of up to 6.9ha, to include one electrical compound, electrical transformer/invertor station modules, 56no. battery storage enclosures (BSEs), 28no. power conversion systems on concrete support structures, attenuation pond of 1220 cubic metres, indicative 110kV buried import/export cable and indicative 110kV substation to facilitate connection to the existing 110kV Meath Hill substation, upgraded access tracks, crane hardstanding, associated electrical ducting, palisade security fencing and CCTV system, landscaping works, lighting poles and all other ancillary and miscellaneous site works including site clearance
CONDITIONALSite adjacent to and northwest of Meath Hill Substation Meath Hill , and Ardagh between the settlements of Kingscourt and Drumconrath , Co. Meath · 11 Jul 2025
permission for the construction of an electricity storage facility comprising a Battery Energy Storage System (BESS), within a total site area of up to 6.9ha, to include one electrical compound, electrical transformer/invertor station modules, 56no. battery storage enclosures (BSEs), 28no. power conversion systems on concrete support structures, attenuation pond of 1220 cubic metres, indicative 110kV buried import/export cable and indicative 110kV substation to facilitate connection to the existing 110kV Meath Hill substation, upgraded access tracks, crane hardstanding, associated electrical ducting, palisade security fencing and CCTV system, landscaping works, lighting poles and all other ancillary and miscellaneous site works including site clearance
INCOMPLETED APPLICATIONSite adjacent to and northwest of Meath Hill Substation , Meath Hill and Ardagh between the settlements of Kingscourt and Drumconrath , Co. Meath · 23 Jun 2025
construction of an electricity storage facility comprising a Battery Energy Storage System (BESS) with an installed capacity of up to 50MW, within a total site area of up to 6.9ha, to include one electrical compound, electrical transformer/inverter station modules, 64no. battery storage enclosures (BSEs), 8no. power conversion systems on concrete support structures, attenuation pond of 1212 cubic metres, indicative 110kV buried import/export cable and indicative 110kV substation to facilitate connection to the existing 110kV Meath Hill substation, upgraded access tracks, crane hardstanding, associated electrical ducting, palisade security fencing and CCTV system, landscaping works, lighting poles and all other ancillary and miscellaneous site works including site clearance
CONDITIONALMeath Hill and Ardagh , between the settlements of Kingscourt and Drumconrath , Co. Meath · 23 Aug 2024
construction of an electricity storage facility comprising a Battery Energy Storage System (BESS) with an installed capacity of up to 50MW, within a total site area of up to 6.9ha, to include one single storey electrical substation building and electrical compound, electrical transformer/inverter station modules, 64no. battery storage enclosures (BSEs), 8 no. power conversion systems on concrete support structures, attenuation pond of 1212 cubic metres, 110kV buried import/export cable to facilitate connection to the existing 110kV Meath Hill substation, upgraded access tracks, crane hardstanding, associated electrical ducting, security fencing and CCTV system, landscaping works, lighting poles and all other ancillary miscellaneous site works include site clearance.
INCOMPLETED APPLICATIONMeath Hill and Ardagh , between the settlements of Kingscourt and Drumconrath , Co. Meath · 26 Jul 2024
Upgrading of an existing 110kV electrical substation to facilitate connection to a consented battery energy storage system (BESS) (Ref. KA/180156). Upgrade works to the substation include construction of a new electrical 110kV line bay comprising of 1) Cable Sealing End (CSE) and concrete plinth; Surge Arrestor (SA) and concrete plinth; Disconnect switch to Earth and concrete plinth; Voltage Transformer (VT) and concrete plinth; Current Transformer (CT) and concrete plinth; Circuit Breaker (CB) and concrete plinth; Disconnect switch and concrete plinth; All necessary electrical cabling to connect above listed equipment with existing busbar and control cabling; Works to include all necessary foundations and concrete ductwork 2) Construction of an electrical busbar sectionaliser to divide the existing 110kV busbar. New equipment to be installed would include: Current Transformer (CT) and concrete plinth; Circuit Breaker (CB) and concrete plinth; All necessary electrical cabling to connect above listed equipment with existing busbar and control cabling. 3) Replace the northern section of existing Steel wire fence with a 2.6m tall palisade fence including a gate. 4) Construction of an Interface (Marshalling) Kiosk and plinth located at the boundary between ESBN substation land folio and BESS (approved Planning Permission – Register No. KA/180156). Kiosk to be enclosed by 2.6m tall palisade fence including a gate. 5) Construction of approx. 11m (length) of 4m wide walkway comprising of crushed limestone on geotextile, to connect Meath Hill substation fenced enclosure with the Interface (Marshalling) Kiosk fenced enclosure. 6) Excavation and construction of approx. 23m of underground cable trench (approx. 1.2m deep) to accommodate 110kV cable ducting and associated control and earth cabling ducts. The cabling would run between the Cable Sealing End located in the proposed new line bay in Meath Hill Substation and the Cable Sealing End located into the consented BESS.
CONDITIONALMeath Hill 110kV substation and adjoining land , Meath Hill Drumconrath Navan , Co. Meath · 8 Mar 2024

