Residential development
4 shownthe development that will consist of: (1) construction of 25 no. residential units comprising 12 no. 3-bed houses and 13no. 4-bed houses; (2) connection to roads and services proposed under Phase 1 (reg. ref 22/990) and Phase 2 (reg. ref 23/60793); (3) landscaping and all associated site development works
Rathkeale Road , Adare , Co. Limerick · 9 Apr 2024
the (1) construction of 28 no. residential units and a creche comprising; (a) 13 no. houses consisting of: 3 no. two storey 4-bed detached houses; 2 no. two storey 4-bed semi-detached houses; 8 no. two storey 3-bed semi-detached houses; (b) 12 no. apartments consisting of: 2 no. single storey 1 bed apartments; 4 no. single storey 2 bed apartments; 6 no. two storey 3 bed duplex apartments; (c) creche (289.8sqm) with 3 no. apartments at first floor (2 no. 2 bed and 1 no. 3 bed); (2) connection to roads and services proposed under the neighbouring scheme (reg. ref 22/990); (3) landscaping and all associated site development works
Rathkeale Road , Adare , Co. Limerick · 1 Nov 2023
Provision of 31 no. units and 8 no. plots for affordable housing at two separate development locations. The housing typologies are comprised of 7 no. single storey residential units, 18 no. 2 storey residential units, 6 no. apartment units and 8 no. plots for affordable housing. The unit mix comprises: 2 no. single bedroom units, 17 no. 2 bedroom units, 12 no. 3 bedroom units, new street connecting proposed scheme with existing Deerpark estate, new street connections to the N21, associated footpaths, the reconfiguration of the existing carpark (33 no. spaces) and the provision of new car parking (59 no. spaces), hard landscaping including, homezone areas, bin stores, privacy strip to front gardens, rear garden walls and installation of street lighting, soft landscaping including planting and trees, construction of and/or remedial works to boundaries with adjacent sites, construction of new watermain, new foul sewer connection, storm sewer and surface water drainage systems, connection to public utilities and all associated site works
Deerpark & Rathkeale Road , Adare , Co. Limerick. · 21 Oct 2019
the construction of a housing development of 17 no. residential units comprising of the following: (a) 8 no. two storey 4-bed semi-detached dwellings, and (b) 1 no. residential block (part 2 storey, part 3 storey) consisting of (i) 6 no. 2-bed terraced townhouses over ground & first floor, (ii) 2 no. 3-bed terraced townhouses over ground & first floor, and (iii) 1 no. 3-bed apartment on second floor, together with new pedestrian and vehicular entrance access via existing public car park, boundary treatments, landscaping, and all ancillary site works
Rathkeale Road , Adare , Co. Limerick. · 10 Jul 2019

