Planning application WEB2229/25

PROTECTED STRUCTURE & CHANGE OF USE: Works will consist of: change of use of the building from office use to a single…

26 Clyde Road, Dublin 4

Decision

GRANT PERMISSION

Construction status

Construction commenced

Official building-control evidence dated 6 Apr 2026.

Matched building-control notice CN0139871DC

Source: NBCO/BCMS open data

An official council link is not available for this recorded application.

Application details

Planning reference
WEB2229/25
Council
Dublin City Council
Proposal description
PROTECTED STRUCTURE & CHANGE OF USE: Works will consist of: change of use of the building from office use to a single residential house (as previously granted under Reg. Ref: 4007/24). Construction of a part single storey, part two storey extension to the side and rear, including a double height space. Internal alterations to the existing building including: closing up of interconnecting doors with 27 Clyde Road, removal of stud partition walls on all floors, relocation of some door openings, the replacement of the stairs from lower ground floor to upper ground floor, laying a new concrete floor slab to the lower ground floor with insulation and underfloor heating. Form two new window openings at upper ground floor level on the North-west facade, replacement of uPVC windows to the rear with new up-and-down timber sash windows, refurbishment of existing sash windows to the front and side of the house, replacement of front door with new door to original detail, the alteration of three windows to form door openings and repointing of the brickwork to the front facade. New mechanical and electrical installation including new electrical and gas meters to the front of the house in accordance with Bord Gais and ESB standards. New bathrooms fit outs. New surface water drainage. Landscaping works including gravel parking area to the front and paved terrace to the rear. Widening of the existing vehicular entrance.
Location / address
26 Clyde Road, Dublin 4
Application type
Permission
Received / registered
30 May 2025
Council decision
GRANT PERMISSION
Council decision date
16 Sept 2025
Final grant date
22 Oct 2025

Planning and construction timeline

Key dated milestones from planning, appeal and official building-control records.

  1. Application received

  2. Further information requested

  3. Further information received

  4. Decision: GRANT PERMISSION

  5. Final grant

  6. Works commenced

    Official NBCO/BCMS data

Location context

Nearby sold prices

Recent Property Price Register sales in Dublin 4. Distances are not shown because the sale records do not contain reliable coordinates.

Explore sold prices