Planning application WEB1830/25

PROTECTED STRUCTURE : The development will consist of: A).

27 Clyde Road, Ballsbridge, Dublin 4, D04 F838

Decision

GRANT PERMISSION

Construction status

Construction commenced

Official building-control evidence dated 17 Sept 2025.

Matched building-control notice CN0133371DC

Source: NBCO/BCMS open data

An official council link is not available for this recorded application.

Application details

Planning reference
WEB1830/25
Council
Dublin City Council
Proposal description
PROTECTED STRUCTURE : The development will consist of: A). Change of use of the building from office use to a single residential house (as previously granted under Reg. Ref: 4008/24); B). Construction of a replacement single-storey flat roof side extension, with sedum roof and associated roof lights, at lower ground floor level; C). Construction of a new single-storey flat roof extension to the rear at lower ground floor level, with associated roof terrace accessed at upper ground floor level; D). Cleaning of the existing granite and brick facades and granite entrance steps; repointing of existing front and part side elevations and entrance steps in lime mortar; E). The replacement of the non-original uPVC windows, on the rear elevation only , with timber sliding sash windows, together with amendments of two select opes (conversion from window to door openings); F). The replacement of the existing non-original lower ground floor slab with a new insulated concrete slab; G). Internal reconfiguration, refurbishment and associated conservation and restoration works throughout; H). New mechanical and electrical services throughout; I) New pedestrian gate to side lane; J) Widening of the existing vehicular entrance together with associated modifications to the existing vehicular entrance gates and railings to the front boundary, and provision of new railing to the east boundary of the front garden; L). All ancillary site, boundary and landscaping works.
Location / address
27 Clyde Road, Ballsbridge, Dublin 4, D04 F838
Application type
Permission
Received / registered
14 Apr 2025
Council decision
GRANT PERMISSION
Council decision date
11 Jul 2025
Final grant date
18 Aug 2025

Planning and construction timeline

Key dated milestones from planning, appeal and official building-control records.

  1. Application received

  2. Further information requested

  3. Further information received

  4. Decision: GRANT PERMISSION

  5. Final grant

  6. Works commenced

    Official NBCO/BCMS data

Location context

Nearby sold prices

Recent Property Price Register sales sharing the published Eircode. This is location context, not confirmation that the records concern the same property.

Explore sold prices