Planning application 5008/26

PROTECTED STRUCTURE:PERMISSION & RETENTION: Planning permission and retention permission for a Protected Structure.

No. 7 Summerville Park, Dublin 6, D06 A2F2

Decision

GRANT PERMISSION AND RETENTION PERMISSION

Construction status

Construction commenced

Official building-control evidence dated 13 May 2026.

Matched building-control notice CN0142093DC

Source: NBCO/BCMS open data

An official council link is not available for this recorded application.

Application details

Planning reference
5008/26
Council
Dublin City Council
Proposal description
PROTECTED STRUCTURE:PERMISSION & RETENTION: Planning permission and retention permission for a Protected Structure. Retention for: change of use of existing dwelling previously divided into 2 flats into a single family dwelling; Permission for: reroofing existing existing main roof using existing slates where possible and new to match existing; Removal of existing metal skylight at rear of building and replacement with 2 new glazed roof windows in rear main roof; Replacement of non- original mineral felt finish to roof and walls of attic level rear return with black/grey zinc cladding & replacement of window; Removal of external metal window bars to 3 no. windows to the rear; Removal of existing PVC windows at ground and first floor of return and replacement with painted timber sliding sash windows; Removal of existing PVC door in rear return and replacement with painted timber frame glazed door; Demolition of boiler house and flue in the rear yard & landscaping to yard; Repair of damaged black and white floor tiles at front entrance; Ancillary site works and various internal alterations not subject to planning permission at No.7 Summerville Park, Dublin 6, D06 A2F2, a protected structure.
Location / address
No. 7 Summerville Park, Dublin 6, D06 A2F2
Application type
Permission
Received / registered
12 Jan 2026
Council decision
GRANT PERMISSION AND RETENTION PERMISSION
Council decision date
6 Mar 2026
Final grant date
13 Apr 2026

Planning and construction timeline

Key dated milestones from planning, appeal and official building-control records.

  1. Application received

  2. Decision: GRANT PERMISSION AND RETENTION PERMISSION

  3. Final grant

  4. Works commenced

    Official NBCO/BCMS data

Location context

Nearby sold prices

Recent Property Price Register sales in Dublin 6. Distances are not shown because the sale records do not contain reliable coordinates.

Explore sold prices