Large residential
2 shownPermission for the following Large-Scale Residential Development (LRD) at Castletreasure, Douglas, Cork comprising the construction of 300 no. residential units to include 210 no. dwelling houses (comprising a mix of 2, 3 and 4 bed, detached, semi-detached and townhouse/terraced units) and 90 no. apartment units (comprising a mix of 1 and 2 bed units in 2 no. blocks ranging in height from 2 to 6 storeys), 1 no. creche and all associated ancillary development including vehicular, pedestrian and cycle access, car and bicycle parking, bin and bike stores, drainage,landscaping, public lighting, plant and equipment (including 4 no. sub-stations) boundary treatments and amenity areas. The proposed LRD makes provision for: a pedestrian bridge crossing to connect to Ballybrack Valley pedestrian and cycling route; a pedestrian connection to the Bayly residential development to the north; vehicular and pedestrian connectivity to the adjoining lands to the south and to the Carleton residential development to the east. The proposed LRD also includes improvements to the local road and footpath network on Donnybrook Hill. An Environmental Impact Assessment Report and Natura Impact Statement has been submitted to the planning authority with the application. The Environmental Impact Assessment Report and Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority. The application may be inspected online at the following website set up by the applicant: www.donnybrookmanorlrd.ie
Castletreasure (townland), Douglas, Cork · 20 Jul 2026
For a 10 year planning permission for a Large-Scale Residential Development (LRD) at Castletreasure, Moneygurney and Maryborough (townlands), Douglas, Cork. The development will consist of: the demolition of an existing dwelling house and associated agricultural outbuildings and the construction of a mixed-use residential development of 580 no. residential units consisting of 263 no. dwelling houses and 317 no. apartment/duplex units and all ancillary site development works. The proposed development also includes a 2-storey 122 no. child capacity creche and a 2-storey mixed-use building with retail and café uses at ground floor and 2 no. commercial/retail service units at first floor level. The 263 no. dwelling houses will include 88 no. 4 bedroom semi-detached dwelling houses, 4 no. 4 bedroom townhouses, 136 no. 3 bedroom semi-detached dwelling houses,18 no. 3 bedroom townhouses and 17 no. 2 bedroom townhouses. The proposed 317 no. apartment/duplex units will include 8 no. 3 bedroom units, 218 no. 2 bedroom units and 91 no. 1 bedroom units to be provided in 27 no. apartment/duplex buildings ranging in height from 2–4 storeys over basement. The proposed development makes provision for the construction of a section and extension of the Ballybrack Valley Pedestrian & Cycle Route and for pedestrian and cycle connections to the proposed Ballybrack Valley Pedestrian & Cycle Route. The proposed development also includes minor modifications to the residential development to the north permitted by An Bord Pleanála reference 304367-19, which include amendments to the permitted boundary treatments, public open space and the creation of vehicular, pedestrian and cycle connections. Access to the proposed development will be via a proposed vehicular bridge over the Moneygurney Stream to a new junction on the existing Carr’s Hill/Carrigaline Road (R609). An alternative access to the lands is also proposed and which integrates with the Carr’s Hill/Carrigaline Road (R609) upgrades and Carr’s Hill Junction permitted by the M28 Cork to Ringaskiddy Motorway Scheme (An Bord Pleanála References 04.HA0053 and 04.MA0014) which will be implemented once the M28 Motorway scheme is operational. Ancillary site works include the provision of bicycle parking and bin storage facilities, landscaping and servicing proposals including the diversion of existing underground service infrastructure and the delivery of upgrades to the footpath and foul sewer network on Carr’s Hill/Carrigaline R
Castletreasure , Moneygurney and , Maryborough (townlands) · 1 Feb 2024

